13
4. Loosely install the remaining bracket (001-4425B) to the bottom bracket attaching in the
middle. Level the two pieces and extend the top bracket until it reaches the top of the baler.
Secure with a 1/4" flange bolt and nut.
5. Mark and drill the top hole with a 1/4" bit. Secure with a 1/4" flange bolt and nut.
6. Route the hoses from the pumps down the cross member the tank is mounted on towards the
right side tire. The hose will go up the right side of the baler towards to the top and center of
the baler towards the hole that will be made in the next step.
7. Cut a 1-1/2" hole in the top of the baler for the hose to route through. Install the grommet once
the hole is complete.
8. Attach the hose, to the elbows, securing with hose clamps. Clear hose to low, green to med.,
and blue to high.
9. Secure the low and medium hoses on the end of the spray shield with two jiffy clips (008-9014)
and a 1/4" x 1/2" round head screw.
10. Install the hose from the shield under the hay tine, to the bracket, and out the top.
11. Secure the hose to the bracket with two jiffy clips (008-9009) and 1/4" flange bolts and nuts.
Keep the hose in the center of the bracket.
12. Run the hose through the top of the baler and down towards the tank. Use the supplied jiffy
clips (008-9009) to secure in route to the tank.
13. Install the hoses on to the correct pumps. See plumbing section.
View from behind the twine box with the inspection door open.
Hay Guard
Spray Shield
1-1/2" hole
Brackets
001-4425B
Location of first
rotating tine
For AGCO part cross-reference visit: www.harvesttec.com/system.html