Ag Leader Technology
DirectCommand
Installation
Apache AS715/1010/1210 (MY 2009-2010)
Page 6 of 13
December 2013
PN: 2005943
Rev. D
Installing
the Display
Parts required for procedure:
•
(1) Ag Leader INTEGRA Display
PN: 4002000
Or
•
(1) EDGE Display
PN: 4001500
Or
•
(1) Insight Display
PN: 4001000
From RAM Mount Kit:
•
(1) RAM 201UD – 5” Arm
PN: 4000279
•
(1) RAM 2451U – Base
PN: 4000280
•
(1) RAM 235U - Base Double U-Bolt
PN: 4000281
Step-by-Step for
Installing the
Display
1.
Turn on the current control console, if equipped with one, and
copy down the boom section widths and flow meter calibration
number.
NOTE: The Raven flow meter calibration is in pulses per
10 gallons, the Ag Leader Display requires pulses per
gallon for calibration. To calculate the appropriate values,
divide the Raven Calibration number by 10 before entering
into the Display.
NOTE:
The Raven boom section widths are in inches, the Ag
Leader Display requires boom widths in feet. Divide the Raven
widths by 12 before entering the widths into the Ag Leader
Display.
2.
Run the machine one last time to make sure all of the rate control
components are in working order before removing the console.
Verifying that all of the rate control components work properly will
help with any potential troubleshooting issues after the
installation.
3.
Disconnect the cable from the back of the rate control console
and remove the console and cabling from the cab.
4.
Lay the Display face down on a stable surface and align the four
holes in the RAM Mount Base PN: 4000280 with the mounting
holes in the back of the Display. Using the four Phillips pan head
screws and lock washers, secure the bracket to the Display.
5.
Take the RAM Base, Double U-bolt PN: 4000281 from the RAM
Rail Mount Kit. Use the two U-bolts, nuts and washers to fasten
the mount to the rail in the right front corner of the cab.