Ag Leader Technology
DirectCommand
Installation
Apache AS715/1010/1210 (MY 2009-2010)
Page 12 of 13
December 2013
PN: 2005943
Rev. D
12. Plug the gray 12-pin plug on the 10 Section Boom Cable into the
receptacle labeled
BOOM
on the Liquid Control Module.
13. Route the opposite end of the 10 Section Boom Cable to the
sprayer boom valves. Disconnect the 4 pin Weatherpack
connectors on the Boom Valves from the machine harness.
14. Connect the 4 pin Weatherpack shrouds of the 10 Section Boom
Cable into the appropriate Boom Valve.
NOTE: Leave dust caps installed on all unused connectors
in the 10 Section Boom Cable
15. Connect the gray 8-pin plug on the Flow Control Cable, PN:
4000451-6 into the receptacle labeled
CHANNEL 1
on the Liquid
Control Module.
16. Route the opposite end of the Flow Control Cable towards the
Sprayer Flow Meter and Flow Control Valve.
17. Disconnect the 3-pin ConXall connector from the Flow Meter and
plug it into the mating connector on the Flow Control Cable.
18. Disconnect the 2 pin molded connector on the Flow Control
Valve, and reconnect it to the mating connector on the Flow
Control Cable.
19. Replace all covers removed during installation.