background image

STEP 13 

To operate the Poolsolar system the water flow needs to be redirected to the solar collector using a

manually operated 3-way valve.  

To direct water flow to solar collector :- Point the handle on the 3-way valve to close the port that directs the
water back to the pool.  The water flow will now pass through the solar collector and back to the pool.

To direct water flow to swimming pool only :- Point the handle to close the solar collector port when solar
heating is not required. It important that the water is not fed to the collector in cold periods of weather or at night as
the solar collector will act like a giant radiator incurring great heat losses!

Your Poolsolar is now ready to start heating your pool.

Automatic 3-way valves are available to redirect the water flow automatically when cold periods arise. Please
contact your pool dealer or go to page 11 for installation details. 

Water Flow

Closed Position

To Solar Collector

Water Flow

Handle

Closed Position

To Pool

(Solar Collector)

by-passed

3-Way Valve Operation

Water flow to Solar Collector

Water flow to pool, bypassing Solar Collector

Winterisation

1. Solar collector must be drained for the winter period.
Remove C3 1.5” thread plug for water removal (U).

2. Drain supply and return pipework. 

U

C3 Threaded Plug

GENERAL MAINTENANCE

Poolsolar is manufactured from a very durable, tough EPDM rubber that is long lasting and will provide many years
of trouble free heating. There is little maintenance apart from hosing down the solar collector to clean it throughout
the season.

In the event that the you experience a leak in the solar collector a repair kit is provided. Go to page 15

.

10

Summary of Contents for Poolsolar

Page 1: ...Poolsolar Installation Guide...

Page 2: ...TY Poolsolar warrants the solar collectors to be free from defects in material and workmanship and to perform under normal use and service for five years from the date of purchase receipt providing th...

Page 3: ...ation system at night or by pass the solar system Alternatively an automatic control system can be installed see page 11 Please take sufficient safety precautions before working on a roof Prior to com...

Page 4: ...s and contains all the necessary components for you to install a solar collector In addition to this you wil require pool plumbing roof adhesive and roof supports angles THE 5 m BOX CONTAINS 3 units o...

Page 5: ...beral amount of lubricant provided D to the header o ring Make sure that the o ring doesn t bulge out after clicking the headers together Do not attempt to glue headers together D STEP 3 Push the rubb...

Page 6: ...haped support angle is supplied in 2 00 m lengths Depending on the number of solar matts that you have purchased cut and prepare the number of support extrusion required to support 90 100 of the heade...

Page 7: ...port Angle STEP 8 Apply an adhesive K bead every 50 cm to the roof structure and unroll the Poolsolar matting It is also a good idea to apply adhesive down the very edge of the matting L 50 cm Adhesiv...

Page 8: ...on strips on the roof support batton every 66 cm as per step 7 on page 6 Afterwards put the roof tiles back in place so the nylon strips stick out 30 cm Attach the nylon strips that stick out of the r...

Page 9: ...typically 1 bar The entire solar collector must be connected diagonally R The lowest point is where the water enters the collector the highest point is where the water exits In each Poolsolar kit you...

Page 10: ...desired diameter For all threaded fittings apply PTFE tape Lubricant ABS PVC Glue STEP 12 Connect ABS PVC 1 5 plumbing to Poolsolar as per diagram below You will need to install a 3 way valve this wil...

Page 11: ...c 3 way valves are available to redirect the water flow automatically when cold periods arise Please contact your pool dealer or go to page 11 for installation details Water Flow Closed Position To So...

Page 12: ...placed on top of the solar collector header manifold Use a Tie wrap to secure into position The Water Temperature Sensor is already located within the motorised valve Note Sun Sensor cable can be ext...

Page 13: ...ms we suggest that you grease the inner side of the valve with a silicon lubricant Remove the screw on the backside of the motor 1 Now remove both motor holders located on each side of the motor 2 3 U...

Page 14: ...r current filtration system has adequate pressure to supply water to the solar collector normally up to 8m high Your water flow pressure is very dependable on the power of the filtration pump plumbing...

Page 15: ...s very dependable on the horse power of the filtration pump plumbing configuration etc If you are unsure about the necessity for a booster pump try using your existing filtration first In the event th...

Page 16: ...ng needs to be cut away either side of the tubing approximately 10cm using a pair of scissors Be careful not to cut the tubing Step 2 Remove and discard broken or damaged nozzle from rubber tubing Dri...

Page 17: ...OLSOLAR MATTING You will need Scissors Pliers Plastic Repair Tube s 30mm x 6mm provided Lubricant provided Tie Wraps provided In the event a tube is punctured carry out the following repair procedure...

Page 18: ......

Reviews: