Mounting
and
commissioning
Europress
21
6.6
Drying filter
Drying filters must be mounted in the suction line in order to dry the
intake air (filters not included, see accessories, chapter 11, page 31).
1
Holder with mounting accesso-
ries
2
Silicon hose
3
Outlet, filtered
4
Filter head, aluminium
5
O ring Ø 54 x 3 NBR
6
SIKU disc 50 µm, dust filter
7
Union nut M 64 x 1.5
8
Drying beads
9
Filter bowl
10
Inlet, not filtered
Fig. 8: Drying filter
1.
Determine the number of drying filters required on the basis of
the table below and fasten them close to the leak detector using
pipe clamps.
For
underground tanks
: 1 x drying filter type TF 220
For
aboveground tanks
(only a
single
aboveground tank may
be connected):
Interstitial space volume
Number of drying filters
up to 300 litres
1 x TF 220
up to 700 litres
2 x TF 220
up to 1000 litres
3 x TF 220
up to 1500 litres
4 x TF 220
up to 1800 litres
5 x TF 220
up to 2200 litres
6 x TF 220
up to 2600 litres
7 x TF 220
up to 3000 litres
8 x TF 220
Summary of Contents for 43790
Page 34: ...Appendix 34 Europress 16 2 Approval documents ...
Page 35: ...Appendix Europress 35 ...
Page 36: ...Appendix 36 Europress ...
Page 37: ...Appendix Europress 37 ...
Page 38: ...Appendix 38 Europress ...
Page 39: ...Appendix Europress 39 ...
Page 40: ...Appendix 40 Europress ...