61
4.
Finished hot air exit cut outs shown below.
5. Gather and install the supplied silicone insula-
tors in the slots of the tuned pipe holding brack-
ets as shown below.
6. Slide the pipes into the pipe tunnel as shown
below.
7. Assemble the pipes to the headers with the Tef-
lon coupler and clamps in accordance with
manufactures instructions.