GUIDE#: pwb-AIrbornE-v1-004
13
STEP 15
Lowering the Tower.
loosen the rear tower hinges about 1/4 turn. the front tower hinges need to be disconnected
with the help of an Allen key to allow the tower to fold back.
once the tower is folded back, remove the 2 Allen bolts from the top section hinge which will
allow the arms to fold down for storage.
STEP 14 - LOCKING ThE ROTATING FITTINGS
once you are happy with your tower installation and all
of the fittings are lined up to allow the tower to fold and
function correctly it will then be important to firmly lock the
rotating fittings in place to prevent any unwanted rota
-
tion or loosening. to do this the m12 x 40mm bolts that run
through the center of the fittings will need to be firmly tight
-
ened. next, the pre-instaleld m6 x 10mm fasteners found
in the fittings will then need to be firmly tightened with an
Allen key. we recommend using threadlocker during this
step.
m6 x 12mm