![AEG Thyro-E 3A-10 Operating Instructions Manual Download Page 41](http://html.mh-extra.com/html/aeg/thyro-e-3a-10/thyro-e-3a-10_operating-instructions-manual_8765041.webp)
Commissioning
Operations Manual Thyro Power Manager
Page 42 of 42
Version: 1.7.2009
8000022632 BAL, EN
The following figures show the programming procedure for PROG 1. The table structure
permits an implementation of the steps from the left to the right for each programme.
Programming starts when the “OK” button is actuated 3x.
Figure 21: Timer, Start and 1x „OK“
Figure 22: Timer, two and three times „OK“
Start
Button „OK“
Button „OK“
Button „OK“