User Manual UPS IST3-J
3 Installation
19
Figure3-4
Wiring diagram of 2-3kVA/(L)
Figure3-5
Wiring diagram of 6kVA(L), 10kVA (/B)
Mains socket should be near by the UPS and easy to operate.
For long backup model, connect the UPS with mains first and then insert the battery
expansion wire.
Generally, the load current of each output socket should be not more than 10A.
Summary of Contents for IST3-J
Page 1: ...UPS IST3 J 1 10 kVA User Manual...
Page 2: ......
Page 6: ......
Page 24: ...3 Installation User Manual 18 Figure3 3 Wiring diagram of 1kVA L...
Page 37: ......