User Manual UPS IST3-J
3 Installation
15
with the leakage protection to avoid mis-operation. The distribution box is better to be made
by the professional company. The selection of input breaker refers to Table3-2.
Table3-2
Recommended input breaker specification
1kVA(L)
2kVA(L)
3kVA(L)
6kVA(L)
10kVA (/B)
Max.
current
Break
er
Max.
curren
t
Break
er
Max.
curren
t
Break
er
Max.
curren
t
Break
er
Max.
current
Break
er
AC input (A)
6
10
12
20
18
32
36
50
60
100
DC input (for
long backup
model) (A)
37
50
37
50
42
50
39
50
65
100
3.3 Install UPS
The installation for the UPS and the battery box is the same, in this section, we take the UPS installation
as an example to illustrate.
Step 1
Fasten the two angle irons onto the two sides of the UPS by 4 sunk screws, as shown in
Figure3-1.
Figure3-1
Install angle iron
Step 2
Push the UPS into the cabinet, and fasten it by screws, as shown in Figure3-2.
Summary of Contents for IST3-J
Page 1: ...UPS IST3 J 1 10 kVA User Manual...
Page 2: ......
Page 6: ......
Page 24: ...3 Installation User Manual 18 Figure3 3 Wiring diagram of 1kVA L...
Page 37: ......