EKI-7710 Series User Manual
25
3.
Insert a small flat-bladed screwdriver in the V1+/V1- wire-clamp screws, and
loosen the screws.
4.
Insert the negative/positive DC wires into the V+/V- terminals of PW1. If setting
up power redundancy, connect PW2 in the same manner.
5.
Tighten the wire-clamp screws to secure the DC wires in place.
Figure 2.22 Installing DC Wires in a Terminal Block
6.
Align the terminal block over the terminal block receptor on the switch.
7.
Insert the terminal block and press it in until it is flush with the terminal block
receptor.
8.
Tighten the screws on the terminal block to secure it to the terminal block recep-
tor.
If there is no gap between the terminal block and the terminal receptor, the ter-
minal block is seated correctly.
Figure 2.23 Securing a Terminal Block to a Receptor
1A@24V
1A@24V
Loosening
Wire-clamp
Screws
Installing DC
Wires
Securing Wire-
clamp Screws
1A@24V
Summary of Contents for EKI-7710 Series
Page 1: ...User Manual EKI 7710 Series 8FE 2G 8GE 2G Combo port L2 Managed Switch...
Page 14: ...Chapter 1 1Product Overview...
Page 23: ...Chapter 2 2Switch Installation...
Page 40: ...Chapter 3 3Configuration Utility...
Page 46: ...Chapter 4 4Managing Switch...
Page 154: ...Chapter 5 5Troubleshooting...