EKI-7710 Series User Manual
17
5.
Make sure the module is seated correctly before sliding the module into the slot.
A click sounds when it is locked in place.
Figure 2.7 Installing an SFP Transceiver
6.
Remove the protective plug from the SFP transceiver.
7.
Insert the fiber cable into the transceiver. The connector snaps into place and
locks.
Figure 2.8 Attaching a Fiber Optic Cable to a Transceiver
8.
Repeat the previous procedures to install any additional SFP transceivers in the
switch.
The fiber port is now setup.
Note!
If you are attaching fiber optic cables to the transceiver, continue with
the following step. Otherwise, repeat the previous steps to install the
remaining SFP transceivers in the device.
Note!
Do not remove the dust plug from the transceiver if you are not installing
the fiber optic cable at this time. The dust plug protects hardware from
dust contamination.
Handle
Summary of Contents for EKI-7710 Series
Page 1: ...User Manual EKI 7710 Series 8FE 2G 8GE 2G Combo port L2 Managed Switch...
Page 14: ...Chapter 1 1Product Overview...
Page 23: ...Chapter 2 2Switch Installation...
Page 40: ...Chapter 3 3Configuration Utility...
Page 46: ...Chapter 4 4Managing Switch...
Page 154: ...Chapter 5 5Troubleshooting...