Transport
Version: 1.4
All-in-one ultra-fast charging system - brief operating instructions
Page
13
of
21
3.2.2 Crane for moving the system
Recommended for moving the system to its final location (without pallet).
−
When lifting, observe the load diagram of the crane
−
A separate belt or a lifting chain
must be attached to each ring.
−
On every ring, only vertical loading is permitted, otherwise the rings can bend.
−
Use non-slip mats on any surfaces where the system will have to be set down temporarily without a pallet.
F
IGURE
4:
L
IFTING BY CRANE
(
DETAIL FROM CONSTRUCTION DRAWING
)