Call StormTech at
860.529.8188
or
888.892.2694
or visit our website at
www.stormtech.com
for technical and product information.
4
StormTech SC-160LP Chamber
Shipping
132 chambers/pallet
144 end caps/pallet
12 pallets/truck
StormTech SC-160LP (not to scale)
Nominal Chamber Specifications
Size (LxWxH)
85.4” x 25.0” x 12.0” (2170 x 635 x 305 mm)
Chamber Storage
6.85 ft
3
(0.19 m
3
)
Min. Installed Storage*
15.0 ft
3
(0.42 m
3
)
Weight
24.0 lbs. (10.9 kg)
*Assumes 6” (150 mm) stone above, 4” (100 mm) below and stone between
chambers with 40% stone porosity
THe INSTALLeD CHAMbeR SySTeM SHALL PROVIDe THe LOAD FACTORS SPeCIFIeD IN THe AASHTO LRFD bRIDGe DeSIGN SPeCIFICATIONS SeCTION 12.12 FOR eARTH AND LIVe LOADS, WITH
CONSIDeRATION FOR IMPACT AND MuLTIPLe VeHICLe PReSeNCeS.
14"
(350 mm)
MIN*
10'
(3.0 m)
MAX
6" (150 mm)
MIN
12" (300 mm) MIN
25"
(635 mm)
12" (300 mm)
TYP
DEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 4" (100 mm) MIN
WITH GEOGRID BX124GG
12"
(300 mm)
*MINIMUM COVER TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 20" (510 mm).
SC-160LP
END CAP
NO SPACING REQUIRED
BETWEEN CHAMBERS
SINGLE LAYER OF GEOGRID BX124GG TO BE INSTALLED
BETWEEN NON WOVEN GEOTEXTILE AND BASE STONE
PERIMETER STONE
EXCAVATION WALL
(CAN BE SLOPED
OR VERTICAL)
SITE DESIGN ENGINEER IS RESPONSIBLE FOR
THE ENSURING THE REQUIRED BEARING
CAPACITY OF SUBGRADE SOILS
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
CHAMBERS SHALL BE BE DESIGNED IN ACCORDANCE WITH ASTM F2787
"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC
CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
FINES, COMPACT IN 6" (150 mm) MAX LIFTS TO 95% PROCTOR
DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS.
ADS GEOSYTHETICS 601T NON-WOVEN
GEOTEXTILE ALL AROUND CLEAN, CRUSHED,
ANGULAR EMBEDMENT STONE
CHAMBERS SHALL MEET THE REQUIREMENTS FOR
ASTM F2418 POLYPROPLENE (PP) CHAMBERS
OR ASTM F2922 POLYETHYLENE (PE) CHAMBERS
EMBEDMENT STONE SHALL BE A CLEAN, CRUSHED AND ANGULAR
STONE WITH AN AASHTO M43 DESIGNATION BETWEEN #3 AND #57
Designed to meet the most stringent industry performance standards for superior structural
integrity while providing designers with a cost-effective method to save valuable land and
protect water resources. The StormTech system is designed primarily to be used under
parking lots, thus maximizing land usage for commercial and municipal applications.
StormTech chambers can also be used in conjunction with Green Infrastructure
, thus
enhancing the performance and extending the service life of these practices.
The SC-160LP chamber was developed for infiltration and detention in shallow cover
applications
• Only 14” (350 mm) required from top of chamber to bottom of pavement
• Only 12” (300 mm) tall
• Installs toe to toe—no additional spacing between rows
Summary of Contents for StormTech DC-780
Page 2: ...An company TOOL 2 0 DESIGN ...
Page 39: ......