cExpress-EL User’s Guide
PICMG COM.0 R3.0
Page 21
Copyright © 2021 ADLINK Technology, Inc.
Row A
Row B
Row C
Row D
A105 VCC_12V
B105 VCC_12V
C105 VCC_12V
D105 VCC_12V
A106 VCC_12V
B106 VCC_12V
C106 VCC_12V
D106 VCC_12V
A107 VCC_12V
B107 VCC_12V
C107 VCC_12V
D107 VCC_12V
A108 VCC_12V
B108 VCC_12V
C108 VCC_12V
D108 VCC_12V
A109 VCC_12V
B109 VCC_12V
C109 VCC_12V
D109 VCC_12V
A110
GND (FIXED)
B110
GND (FIXED)
C110 GND
(FIXED)
D110 GND
(FIXED)
Notes
: STRIKETHROUGH strikethrough entries are not supported functions on this product
eSPI (in place of LPC) is a BOM option supported by project basis
USB 3.2 upgrade signals (lanes 2, 3) via USB Hub are BOM options supported by project basis
eDP (in place of LVDS) and VGA (in place of DDI 2) are BOM options supported by project basis