background image

 

                                                     

Page 3 

1.2 

Safety Tips 

 
 
 

 

Our customer service

 

department

  has its own service 

engineers and, if required, maintenance is available.  

 

 

The  Alpha  Calender  Roll-Master 1.2 

meets  the European 

Legislation standard.  Under normal conditions accidents are 
rare.  However listed below are some practical points to ensure 
your safety. 

 

 

Make sure there is sufficient space around the machine

 

for the heat to dissipate from the drum, without interference. 

Only persons fully trained should operate this machine.

 

 

 

Always switch off

  the current (and pull plug out of the 

socket) when undertaking maintenance work or when 
cleaning the machine. 

 

 

Ensure that there is

 sufficient space around the machine.  

Cables and connections must not get jammed.  Although the 
heat radiation of the press is low, there should be enough 
space for cooling down. 

 

 

Avoid contact

 with the heating drum. 

 

 

DO NOT REMOVE ANY  INSTRUMENT COVERS 
UNLESS QUALIFIED TO DO SO

 - touching internal parts is 

dangerous and may cause shock hazard. All electrical 
connections inside covers are live.  Never operate Press with any 
covers and/or guards removed. 

 

 

PROTECT THE MAINS CABLE

 - damage to the mains cable 

may cause fire or shock hazard.  When unplugging, hold by the 
plug only and remove carefully.  Take care that the mains cable 
does not come into contact with the heating drum (or moving 
parts of the machine) during operation of the machine. 

 

 

OPERATING AMBIENT TEMPERATURE RANGE

 

the 

operating ambient temperature range is 0

o

C  -  35

o

C, 

(32

o

F  - 

104

o

F) 

and humidity of 20 - 80%. 

 

 

MACHINE FUSE(S)

 –

 

28.1 Amps. 

 

 

WARNING  -  THIS APPARATUS MUST BE EARTHED 
(GROUNDED)

 

 

 

CAUTION

 

This machine gets hot whilst operating.  Take care not to touch 
any surfaces that are labelled “HOT”.

 

 

 

MACHINE OPERATION 

Only persons trained to do so should operate this machine

 

1.2.1

 

Before switching on the machine,

  make sure that all 

electrical wires are connected correctly. The body of the 

 

 

Summary of Contents for Alpha Calender Roll-Master 1.2

Page 1: ...afety regulations ALPHA CALENDER ROLL MASTER 1 2 2018 A Adkins Sons Ltd All rights reserved E OE V1 0 All products within the ADKINS range are labelled with CE marking and are manufactured and tested...

Page 2: ...lly designed and manufactured to ensure that you the user will gain the maximum benefit All A Adkins Sons Limited products are specifically designed to ensure ease of use with particular attention to...

Page 3: ...Machine 6 2 5 Electrical Requirements 7 3 How to operate the Alpha Calender Roll Master 1 2 8 3 1 Pre shrinking of Felt Blanket 8 3 2 Horizontal Adjustment 9 3 3 Heating System 10 3 4 Noise 10 3 5 Cle...

Page 4: ...lignment feature avoids lost and spoiled production due to the blanket tracking off alignment during setup and production and requiring less maintenance during day to day operation The high capacity o...

Page 5: ...er Range N A Machine height 147 3 cm 58 in Machine width 162 6 cm 64 in Machine depth 88 5 cm 27 in Packed Dimensions 194 W x 142 3 H x 88 5 D cm 76 W x 56 H x 27 D in Working area required xxx W x xx...

Page 6: ...e heating drum DO NOT REMOVE ANY INSTRUMENT COVERS UNLESS QUALIFIED TO DO SO touching internal parts is dangerous and may cause shock hazard All electrical connections inside covers are live Never ope...

Page 7: ...ach the transfer paper to the collection roller at the front of the machine under the work table allowing the finished work to be collected automatically The transfer collecting speed can be adjusted...

Page 8: ...ayed at the junction of the upper and lower drive rollers on both sides at the front of the machine The rubber roller is dangerous in operation so care must be taken to keep hands hair clothing or oth...

Page 9: ...h of the machine and twice the width to allow for easy access and maintenance and the room should be dry and well ventilated with a mechanical extractor where possible 2 3 Disassembly of the Shipping...

Page 10: ...l Requirements 2 5 1 Power input point Release the screw on the main terminal connect the three live wires to terminals L1 L2 and L3 one by one and then connect the neutral wire to the terminal marked...

Page 11: ...he felt tension release crank handle to its maximum and then turn back by half a turn 4 The procedures for pre shrinking the felt blanket should be based on the following table Temperature Working tim...

Page 12: ...erature reduces to 80 C 176 F Or activate the auto off function by switching off the heating on off button and the power on off button and the machine will auto off after several hours running to cool...

Page 13: ...should not be undertaken by the end user without firstly consulting an Adkins engineer All parts should be supplied and or approved by A Adkins and Sons Limited 3 4 Noise The rollers and bearings may...

Page 14: ...83 0 87 g cm at 20 C 68 F Viscosity 21 31 mm at 50 C 122 F Flash point open to air 173 C 343 4 F Distillation range 2 v v 340 C 644 F Maximum temperature at use 320 C 608 F The heating oil can be use...

Page 15: ...Thermo sensor to detect surface temperature 7 Heating element 8 Heating oil green 9 Present temperature 10 Preset temperature default value 204 C 400 F 11 Increase setting value 12 Reduce setting val...

Page 16: ...see note below Please Note The Digital Thermometer with external probe is suitable for surface air and immersion penetration measurement which is required for all Adkins heat presses Laser Thermomete...

Page 17: ...ne Drawings and Diagrams On the following pages are the schematic diagrams for the Alpha Calender Roll Master 1 2 4 1 General Layout Page 15 4 2 Control Units Operation Page 17 4 3 General Electrical...

Page 18: ...aft Tension shaft for fabric unwind Gearbox for tension adjustment Exhaust barrier paper tensioning shafts Castor wheel Fan Fan Core plug Barrier paper shaft Barrier paper exhaust shaft Barrier paper...

Page 19: ...4 1 General Layout cont Page 16 Right Cabinet Left Cabinet Gearbox for felt tension and release Rotory power for drum heaters Electrical box Pressure piston for belt Belt actuator Roller tensioners...

Page 20: ...4 2 Control Panel Page 17...

Page 21: ...706 702 SA5 701 705 704 SC WK KM1 PLC 3 KI 1 K2 1 K5 1 L2 L1 SSR 15 16 18 R R HEATING ELEMENTS V1 SQ3 K1 K2 K3 K4 40 41 42 43 V1 G1 G1 24 VDC SWITCH MODE POWER SUPPLY K3 1 K4 1 K3 2 K4 2 V1 G1 24V 0V...

Page 22: ...ant improvement and or modification to meet changing conditions the right is reserved to change the design and or specifications at any time without prior notification and therefore specifications may...

Page 23: ...a replacement press the warranty of the replacement press shall expire on the anniversary date of the original machines invoice to the customer In order for this warranty to be effective no return of...

Page 24: ...nd Sons Limited Manufacturer s Address High Cross 18 Lancaster Road Hinckley W A 0 0 1 E L e r i h s r e t s e c i e L m o d g n i K d e t i n U Type of Equipment Alpha Calender Roll Master 1 2 Standa...

Reviews: