4
Introduction
Power Supplies
Two redundant hot-swappable 300-watt power supplies provide operating voltages for the DLT tape drives
installed in the T5 Enclosure. The two supplies operate in parallel using proprietary power control and
sharing modules. Each supply plugs into the rear of the T5 and can be removed or replaced while the other
supply keeps the system fully operational. There is a normally green indicator on the T5 rear panel, at the top
of each power supply module, which extinguishes whenever the associated power supply fails, is turned off,
or is removed from the chassis.
Figure 1-3: T5 Rear Panel
Power Supplies
Summary of Contents for Tape Array 5
Page 1: ...Installation and O perating Guide Tape Array 5 Rackmount Enclosure...
Page 8: ...viii Blank Page...
Page 10: ...x Table of Contents Blank Page...
Page 16: ...6 Introduction Blank Page...
Page 24: ...14 Installation Blank Page...
Page 25: ...15 Chapter 3 Operation and Maintenance This Chapter p explains how to operate the T5 Enclosure...
Page 40: ...30 Operation and Maintenance Blank Page...
Page 44: ...34 Troubleshooting and Diagnostics Blank Page...
Page 45: ...35 Appendix A Specifications This Appendix p contains specification information on the T5...