Connecting the water drainage pipe
Pull out the water drainage cap with black color (indicated
○
A in above illustration), then
connect the white drainage pipe included in accessory, again connect the other end of this
drainage to the main water drainage pipeline. Make sure not to set the drainage pipe too high.
3. Connect the water hose to the water faucet of the water main supply system
First, install the supplied water quick-connector(from 1/4 to 1/2 inch, with black sealing circle) to
the water faucet by screw thread; Second, remove the clipper from the water quick-connector,
insert the another end of the water hose into this quick-connector port completely, then install back
the clipper, also this step is completed. Note: The water faucet should be supplied by the customer
himself.
Important: The water pressure of main water supply system must be 0.04-05 MPa at least and
0.6 Mpa at largest. If the pressure is too big, it should be installed with pressure decreasing
valve first.
OPERATION THE ICE-MAKING PROCESS
Ice making program is explained in following chart:
Step 1: Standby state
Press
ON/FF
button to
turn on
the unit
Step 2:The arrow
flashes, water flows
in the unit
Step 3: Start to make
ice,and ice-cube symbol
rotates.
Step 4:Dispay the
countdown time of one
ice-making process
Step 5: Ice-harvest
starts,and ice-cube symbol
flashes; At same time the
arrow flashes and water
flow into the water tank
Step 6:During ice-harvest,
water-flowing process
finished to start to make
ice-cube again.