Adesys SVL Series Manual Download Page 5

Page 5

Manual SVL 4G Weblogger 

Adesys B.V. | Wateringen

2 Connection

To connect the SVL correctly, we recommend using exclusively Camden CTB922HE/# type connectors. 

Measurements may be affected if other connectors are used.

2.1 Positioning

Position the SVL where it is not affected by direct sunlight or other heat sources. Choose the place of 

installation such that moisture cannot penetrate the device. The SVL can be mounted onto the TS35 rail 

without screws. The permitted ambient temperature range for the electronics is -20°C to +55°C.

The transmission power of the SVL’s internal GSM/4G module is higher than that of a standard mobile 

phone. Under certain conditions this may affect the functioning of surrounding electronic equipment. The 

effects depend upon the distance between the antenna and surrounding equipment.

2.2  Affixing and removal: DIN rail

The SVL should be affixed to a DIN rail before connection.

• 

Put the SVL onto the DIN rail at an angle [1]. It is important that the SVL’s DIN rail clip is positioned on 

the top of the DIN rail.

• 

Tilt the SVL to clip it into place [2]. Then check whether it is securely seated.

The SVL is removed from a DIN rail as follows.

• 

Place a screwdriver on the underside of the DIN rail clip [3]. Use this as a lever; after approx. 3 mm the 

SVL can be tilted to release it from the DIN rail.

2.3  SIM card

If the SIM card has a PIN code, this should be entered in the setup tool SV-prog. The required SIM card is 

installed as follows:

• 

Switch the SVL off by disconnecting the supply voltage, then press and hold the reset key for 8 seconds 

to switch off the dialer;

• 

The SIM card holder is made accessible by pressing the button next to it using a sharp object. The 

holder is then pushed outwards;

•  Place the SIM card in the holder and slide this back into the SVL;

•  Reconnect the supply voltage to switch the SVL on.

The SVL should be completely switched off before the SIM card is installed. Fitting or removing the SIM 

card with the SVL switched on may damage the SIM card.

Summary of Contents for SVL Series

Page 1: ...MEASURING ALERTING CONNECTING EN Manual SVL Version 06 2019...

Page 2: ...2 7 Ethernet 6 2 8 2G 4G connection 6 2 9 Inputs and outputs 7 3 SV prog 7 3 1 Installation 7 3 2 Status screen 7 3 3 Call list 7 3 4 I O 7 3 4 1 Input delay 7 3 4 2 Recovery report idle 8 3 4 3 Syst...

Page 3: ...oltage protection device To reduce the probability of damage to the equipment the SVL should be placed in an environment protected against electrostatic discharge ESD The SVL is intended for use as a...

Page 4: ...ge You should therefore discuss the remaining risk with your insurer 1 8 Identification 1 Reset button 2 LED status indicator general status on busy antenna level network error message error 3 Antenna...

Page 5: ...re connection Put the SVL onto the DIN rail at an angle 1 It is important that the SVL s DIN rail clip is positioned on the top of the DIN rail Tilt the SVL to clip it into place 2 Then check whether...

Page 6: ...solation and the SVL is connected to the same power supply there is a real chance of earth loops and or short circuits in this power supply 2 6 Reset key The reset key has three functions first of all...

Page 7: ...VL has been switched on the tool will display this in the overview after a few seconds and the SVL can be configured by clicking it When search dialers is pressed SV prog shows all accessible dialers...

Page 8: ...lowing exceptions Data connection URL http svx meetcentrale nl 80 severa Protocol http Port 80 System settings URL mqtt meetcentrale nl Protocol mqtt Port 1883 3 5 2 Own server It is also possible to...

Page 9: ...put channel 1 is active After a few seconds the green LED on busy flashes faster to indicate that the SMS message is being sent The green LED on busy again flashes 1x The SMS message has been sent The...

Page 10: ...parameter1 parameter2 Command O Output Parameter1 A Active of I Idle of P Puls schakelen default 2 seconden active Parameter2 Ingangsnummer Note The output number is not the same as the relay number...

Page 11: ...80 5x Antenna level 81 100 Faster Establishing connection clientmode Number of flashes for on busy green Off SVA is switched off On SVA is switched on Faster Starting up sending message 1x Input 1 ac...

Page 12: ...tage Contact or Digital Input mode Open Collector OC outputs Switchable voltage level Imax per output Outputs are protected against overload Detection disconnection mechanism per 4 outputs arranged Sh...

Page 13: ...res above 2000 metres the maximum operating temperature is reduced by 1 5 C per 300 metres up to a maximum heigth of 4000 metres Regulations EMC Emission EN 301 489 01 V1 9 2 EN 301 489 03 V1 4 1 Clas...

Page 14: ...so available in this SV product line SVA 4G alarm dialler SVM 4G modem Checkmyprocess com Industrial 4G SMS E mail alarm dialler for monitoring of your technical processes Industrial 4G modem sms alar...

Reviews: