CHAPTER 3
93
The following window areas are provided in the window “PPP
Configuration”:
•
Job scheduling: allows to define a time schedule (“Mode”) to
determine when the A850 has to establish a PPP connection
to the internet;
•
Job status: allows to get the information when the last PPP
connection attempt was made, with which success it was
performed, and when the next attempt to connect to the
internet is scheduled;
•
Job dependent settings: allow to lay down that a message
will be forwarded to the address entered into the tree window
“Notification Sending” in case of a successful set-up of a
connection with the internet;
•
Primary Account: allows to set up the access data of the
primary account;
•
Secondary Account: allows to set up the access data of the
secondary account.
Job scheduling
Figure 82. PPP Configuration - Job scheduling
Within “Job scheduling”, the pull down menu “Mode” provides
the following set-ups to gather contact with the internet:
Summary of Contents for A850
Page 92: ...CHAPTER 3 Configuring the Gateway 92 Figure 81 PPP Configuration Window ...
Page 128: ...CHAPTER 3 Configuring the Gateway 128 Figure 132 Dialup Modem Window ...
Page 164: ...CHAPTER 3 Configuring the Gateway 164 ...
Page 177: ...CHAPTER 4 Sensor Type Configuration 177 Figure 183 Sensor type Window Analog ...
Page 196: ...CHAPTER 4 Using the Gateway 196 Figure 216 Sensor type Window LC ...
Page 200: ...CHAPTER 4 Using the Gateway 200 Figure 222 Sensor type Window OC ...
Page 204: ...CHAPTER 4 Using the Gateway 204 Figure 228 Sensor type Window SDI ...
Page 215: ...CHAPTER 4 Logs 215 Figure 241 System Log Selection Log types Figure 242 System Log Log types ...
Page 275: ...CHAPTER 4 RTU Network Configuration 275 Sensor details Figure 319 Sensor details Window ...
Page 366: ...CHAPTER 6 Appendix 366 ...