![Adcon A850 User Manual Download Page 108](http://html.mh-extra.com/html/adcon/a850/a850_user-manual_2848444108.webp)
CHAPTER 3
Configuring the Gateway
108
•
Job scheduling - allows to define a time schedule (“Mode”) to
which time the A850 has to perform a SSH tunneling;
•
Job status - for information at which time the last SSH
tunneling has been performed and with which success, as well
as at which time the next SSH tunnelling is planned;
•
Job dependent settings - allow to arrange that a message will
be forwarded to the address entered in the tree window
“Notification Sending” in case of successful SSH tunneling;
•
Primary Server - allows to assess the access data for the
primary SSH tunnel server;
•
Secondary Server - allows to assess the access data for the
secondary SSH tunnel server.
Job scheduling
Figure 102. SSH Tunnel - Job scheduling
Within “Job scheduling”, the pull down menu “Mode” provides
the following set-ups to start a SSH tunneling:
Note: The job scheduling layed down can be oversteered by the
commands ”Start Job” or “Stop Job” according to Fig. 43
or 46, respectively.
Summary of Contents for A850
Page 92: ...CHAPTER 3 Configuring the Gateway 92 Figure 81 PPP Configuration Window ...
Page 128: ...CHAPTER 3 Configuring the Gateway 128 Figure 132 Dialup Modem Window ...
Page 164: ...CHAPTER 3 Configuring the Gateway 164 ...
Page 177: ...CHAPTER 4 Sensor Type Configuration 177 Figure 183 Sensor type Window Analog ...
Page 196: ...CHAPTER 4 Using the Gateway 196 Figure 216 Sensor type Window LC ...
Page 200: ...CHAPTER 4 Using the Gateway 200 Figure 222 Sensor type Window OC ...
Page 204: ...CHAPTER 4 Using the Gateway 204 Figure 228 Sensor type Window SDI ...
Page 215: ...CHAPTER 4 Logs 215 Figure 241 System Log Selection Log types Figure 242 System Log Log types ...
Page 275: ...CHAPTER 4 RTU Network Configuration 275 Sensor details Figure 319 Sensor details Window ...
Page 366: ...CHAPTER 6 Appendix 366 ...