3.4 S
P
(
(
etting the
Procedure:
1)
There ar
holes on
2)
Connect
tion cabl
Shield b
V S
GU
ME
12
e Electrod
re two projec
n the bottom
t the shield b
les (DCB-PP
box terminal
SOURCE ---
UARD -------
EASURE ----
2707 Resisti
de
ctions in the
of the electro
box terminal
P1801X01).
Electro
--------- V
-------- G
-------- M
Figure 3-5
ivity Chamb
e electrode in
ode with thes
s with the el
ode terminal
Electrode
ber for Liqu
nsertion open
se projection
lectrode term
Connection
uid Sample
3.4 S
ning of the s
ns.
minals by usi
Diagram
Operation M
Setting the E
shield box. A
ing the three
3-9
Manual
Electrode
Align the
e connec-