USER’S MANUAL
V-line 46xx, 47xx
1
1.
IMPORTANT NOTICE
This document is a guideline for the user how to proceed when installing, attending and maintaining the
dispenser. The information included in the present instructions are mandatory and the manufacturer does
not accept any responsibility for any damage due to their non-observance.
The dispenser is complicated equipment providing many important functions.
Prior to putting into operation tanks and the piping system shall be cleaned and fuel purity shall be
checked. Also el. power distribution and correct wiring shall be inspected to prevent injury by el.
current and to provide explosion proofness – fuels are flammable liquids of the 1
st
and 2
nd
danger class!
The manufacturer tests each dispenser considering the function, safety and metrology. Each delivery shall
include the instructions for attendance, maintenance and installation, EC declaration of conformity and a
service book identifying dispenser components. The dispenser, produced with high precision and care,
secures reliable and safe operation. Principal safety regulations protecting the user against injury shall be
kept during operation and maintenance and the dispenser shall be prevented from damage. No
modifications of the dispenser equipment are allowed without producer’s written approval.
The dispenser has been designed for outdoor installation – class according to OIML D11 – C (outdoor -
stationary).
Important instructions for installation and operation:
a)
Study the instructions for attendance, maintenance and installation and other manufacturer’s
documents included within dispenser accessories before you start to handle the equipment.
b)
Check the dispenser delivery completeness and inform the manufacturer immediately in case of any
discrepancies or damage.
c)
The dispenser shall be stored in a dry and protected room before it is installed at the filling station.
d)
Prior to dispenser installation check the completeness of the filling station technology according to the
valid design, check the connecting dimensions of the foundation frame including the piping system
outlet.
e)
Rinse the process equipment (piping) through the filtration equipment until impurities are removed.
f)
The dispenser requires the connection of the vapour return piping of min. DIN 16 – we recommend DN
25.
g)
Wiring and inspection of the dispenser shall be carried out.
h)
When putting the dispenser into operation, proceed according to the point 7 of the present instructions.
i)
A metrology authority specialist shall perform function test and metrology checking.
j)
Being these conditions fulfilled, after the approval of a state supervision authority and the verification
of a metrological office representative, usual operation can be started.
k)
Only qualified and trained staff of a service company can perform service and installation. Service
procedures shall be performed in compliance with the operation regulations of the filling station. The
manufacturer is not responsible for damages due to the incompetence of the staff.
l)
The owner can only start dispensing when the filling station inspection is finished and a metrology
authority carries out metrological verification of the dispensers.
m)
When fuels are pumped, basic hygienical precautions shall be adhered. The owner shall enable the
customer to use protective gloves.
SAVE FOR FUTHER USE!
ATTENTION!
The dispenser shall not be installed in an explosion danger zone 0, 1, 2 in compliance with zones
specified in the EN 60079-10!