![Adam Equipment CCT Manual Download Page 12](http://html1.mh-extra.com/html/adam-equipment/cct/cct_manual_2846079012.webp)
© Adam Equipment Company 2020
5.0 Replacing the load cell
Check that the power is switched off, then follow these steps to replace the load
cell:
Open the scale casing and ensure the power is switched off.
Unscrew the 4 holding screws on the metal frame.
Then unscrew the 2 central screws holding the load cell in place.
Lift the metal frame to expose the load cell.
Detach load cell from the scale.
Once removed, replace this with the new load cell.
Place the metal frame onto the new load cell carefully ensuring that the screw
positions line up.
Screw in the 2 central screw points to hold the load cell in place, then carefully
screw in the 4 exterior screw points.
Once secure, place the scale’s exterior casing back onto the scale base and screw
to close.
Load cell
Central screws
4 holding screws
Summary of Contents for CCT
Page 23: ......