EN • 15
662Y0600 • A
E
N
FR
R
U
P
L
DE
IT
ES
N
L
TABLE OF CORRECTIVE
Corrective measures
Fit lining in chimney
1
Set boiler T° higher
2
Check and clean chimney
3
Comply with local regulations on boiler room ventilation
4
Clean burner and boiler
5
Set room thermostat to desired temperature
6
Clear or replace the circulator
7
Set switch to Winter position or replace switch
8
Fill and vent the system and boiler properly
9
Open radiator valves or adjust thermostatic valves
10
Check that pipes and meter are suitable for the system
11
Replace boiler thermostat
12
Ensure electrical system complies with the regulations
13
Change fuses and find out what caused the problem
14
Keep within the ratings stated by ACV
15
Set the thermostat to the desired temperature or replace
16
Replace Summer/Winter switch
17
Replace On/Off switch
18
This is not normal, find the cause
19
Replace fan
20
Replace electrode or adjust properly
21
Insert connectors properly
22
Replace gas valve ensuring setting parameters are correct
23
This table may be used after instruction received at ACV