![background image](http://html.mh-extra.com/html/acer/veriton-x2610/veriton-x2610_service-manual_2838235064.webp)
56
Chapter 3
Assembly Requirements
To assemble the computer, you need the following tools:
•
Wrist grounding strap and conductive mat for preventing electrostatic discharge
•
Flat-blade screwdriver
•
Philips screwdriver
•
Hex screwdriver
•
Plastic flat-blade screwdriver
•
Plastic tweezers
NOTE:
The screws for the different components vary in size. During the assembly process, group the screws
with the corresponding components to avoid mismatch when putting back the components.
Summary of Contents for Veriton X2610
Page 1: ...Acer Veriton X2610 X2610G X2618G X2619G Service Guide PRINTED IN TAIWAN ...
Page 14: ...6 Chapter 1 Block Diagram ...
Page 53: ...Chapter 3 45 4 Take the speaker out of chassis ...
Page 57: ...Chapter 3 49 Removing the TPM Module Card 1 Removing the TPM module card from the motherboard ...
Page 69: ...Chapter 3 61 Install the TPM Module Card 1 Install the TPM module card to the motherboard ...
Page 73: ...Chapter 3 65 Install the I O Shielding 1 Install I O shielding into chassis ...
Page 80: ...72 Chapter 3 4 Connect the data cable and power cable to the rear of the hard disk drive ...
Page 86: ...78 Chapter 3 Install the Side Panel 1 Install the side Panel then fix two Screws ...
Page 94: ...Chapter 5 86 M B Placement Jumper and Connector Information Chapter 5 ...