![background image](http://html.mh-extra.com/html/acer/altos-g5450-series/altos-g5450-series_user-manual_5827145.webp)
127
3
Extend the cable arm enough to attach it to the installed M6 cage
nuts, and secure it with two M6 x 18 screws.
4
Arrange the server cables.
(1) Connect the power, peripheral and networking cables into
their appropriate ports on the rear panel.
Go to page 26 for related instructions.
(2) Secure all server cables to the cable arm using the cable
clamps.
Summary of Contents for Altos G5450 Series
Page 1: ...Acer Altos G5450 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 32: ...1 System tour 14 System boards Mainboard ...
Page 41: ...2 System setup ...
Page 50: ...2 System setup 32 ...
Page 51: ...3 System upgrade ...
Page 85: ...4 System BIOS ...
Page 86: ...4 System BIOS 68 ...
Page 113: ...5 System troubleshooting ...
Page 124: ...5 System troubleshooting 106 ...
Page 125: ...Appendix A Server management tools ...
Page 133: ...Appendix B Rack mount configuration ...
Page 134: ...This appendix shows you how to set up the Altos G5450 server in a rack mount configuration ...