
Appendix B: Rack mount configuration
122
3
Remove the inner rails from the mounting rails.
(1) Extend the inner rail from the mounting rail until the rail
release latch is exposed.
(2) Depress the release latch
(1)
and slip the inner rail out
(2)
.
Do the same thing to the other mounting rail.
4
Attach the rack handles and inner rails to the server.
(1) Align the screw holes on the rack handles with those on the
server.
(2) Secure the rack handles with two U#6-32 x 6.4 screws each.
(3) Insert the pegs on the server with the notches on the
mounting rails, then slide the mounting rails backward to seat
them properly.
(4) Secure the mounting rails to the server with two M4 x 5 screws
each.
Summary of Contents for Altos G5450 Series
Page 1: ...Acer Altos G5450 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 32: ...1 System tour 14 System boards Mainboard ...
Page 41: ...2 System setup ...
Page 50: ...2 System setup 32 ...
Page 51: ...3 System upgrade ...
Page 85: ...4 System BIOS ...
Page 86: ...4 System BIOS 68 ...
Page 113: ...5 System troubleshooting ...
Page 124: ...5 System troubleshooting 106 ...
Page 125: ...Appendix A Server management tools ...
Page 133: ...Appendix B Rack mount configuration ...
Page 134: ...This appendix shows you how to set up the Altos G5450 server in a rack mount configuration ...