Chapter 1
Getting Started
4
Preinstallation
The preinstallation process involves the following activities:
❑
Selecting a site
❑
Unpacking components
Selecting a Site
Consider the following when selecting a site for your
computer:
❑
Determine the best site for your system. Cable paths
should not run near equipment that might cause
electromagnetic or radio frequency interference such as
radio transmitters, televisions, copy machines, or heating
and air-conditioning equipment.
❑
Route cables away from personnel and equipment traffic.
❑
Avoid dusty areas and extremes of temperature and
humidity.
Unpacking Components
Unpack the contents of each box carefully. Save all packing
materials in case you need to move or ship the system in the
future.
Check that all items are present and in good condition.
Contact your dealer immediately if anything is missing or
damaged.
Ap4400-e.book Page 4 Friday, October 1, 1999 2:09 PM
Summary of Contents for AcerPower 4400
Page 1: ...AcerPower 4400 User s Guide ...
Page 8: ...Notices viii ...
Page 11: ...Getting Started Chapter 1 ...
Page 32: ...Chapter 1 Getting Started 22 ...
Page 33: ...System Board Information Chapter 2 ...
Page 46: ...Chapter 2 System Board Information 36 ...
Page 47: ...Award BIOS Chapter 3 ...
Page 62: ...Chapter 3 Award BIOS 52 100 MHz PC100 CPU CLK CPU SDRAM Recommended Setting ...
Page 79: ...69 Save Exit Setup This function automatically saves all CMOS values before leaving Setup ...
Page 81: ...Upgrading the System Chapter 4 ...
Page 87: ...77 6 To detach the metal bracket frame lift it up and then gently pull it out ...
Page 93: ...83 3 Gently pull the CPU straight up from its socket ...