V
Roof:
- The standard roof is equipped with matt glass; with the smooth side facing to the exterior of the greenhouse.
- Choose the position of the roof window; do not place these next to a façade.
- For the moment, do not place glass or rubber on this place where the roof windows will be installed.
- If several roof windows are provided: It is not possible to install 2 roof windows next to one another.
- Put the glass on top of the sidewall and slide it between the roof profiles in the upward direction, until it does not rest on the sidewall anymore.
- Pull the glass downward again in the provided slot. Leave a space where the roof window will be placed later on.
- After having placed all the roof window-panes, put the rubbers in place. The rubber is pressed on all roof profiles and on the top side of the façade to fasten the glass.
Do not put rubbers on the profiles next to the roof window, as yet.
- The roof window opening is a place where you can easily press the rubbers on the roof.
- A handy roller and pressure movement make pressing easier.
- At the top, the rubber is slit in the ridge and at the bottom, it is cut off above the gutter, somewhat lower than the bottom side of the glass.
Page 10 Glazing the Sidewalls
The standard sidewalls are equipped with clear glass. At the top, the glass fits in the slot provided to that end and at the bottom rests on the foundation between the same
profiles as in the roof. At the top, the rubber is slit against the gutter and at the bottom it is cut off halfway the foundation. Repeat for the second sidewall.
Page 11 Glazing the Façades
The standard façades are equipped with clear glass. 2 pieces of glass are placed on top of one another with a glass strip, putting the smallest side at the outside. Put
the rubbers in place as soon as possible!!! For each glass pane!!! Do so for both façades. Do not put rubber around the door position.
(Remark : glass strip only for -H
(example: R305H) greenhouses)
Page 12 Door
Open the iron work bag. The numbers of the detailed views indicate the assembly order. Tighten the assembly definitively.
Page 13 Door
The wheels on top of the door do not have a washer; at the bottom, the wheels have a washer, as indicated on the detailed views. The wheels are tightened by screwing
them at 5cm from the side.
Page 14 Door
Silicone is used on both assembly profiles. Here, the silicone serves as sealer, avoiding that the profiles can slide. Slide the door on both assembly profiles. Then place the
glass in the door and put the rubbers in place.
Page 15 Door
Install the handle on the inside panel of the door, halfway the vertical door profile. The handle also serves as door stop.
Page 16 Cross Beam
Open the roof window iron work bag. The numbers of the detailed views indicate the assembly order. Tighten the assembly definitively. Install the elongated plates with the
bulge in the bolt slot of the crossbeam.
Page 17 Roof Window
The numbers of the detailed views indicate the assembly order. Put the rubbers of the profiles in place after installation of the glass.
Summary of Contents for R410
Page 2: ......
Page 33: ...GEVEL PIGNON GABLE GIEBEL 2 B B B B B B B B B B 1 2 3 4 5 6 7 8 1 2 4 6 3 5 7 8 ...
Page 36: ...KADER CADRE FRAME RAHMEN 5 2 1a 1b 2 1a 1b 1a 1b 1a 1b 1a 1b 2 2 2 ...
Page 42: ...VOORBEREIDING PRÉPARATION PREPARATION VORBEREITING 10 1 2 A B 3 3 A B 2 2 2 2 2 3 3 2 ...
Page 47: ...DEUR PORTE DOOR TÜR 15 2 3 1 4 2 3 1 4 ...
Page 49: ...DEUR PORTE DOOR TÜR 17 1 2 b a 1 2x 2 ...
Page 56: ...AFDEKPLAATJES PLAQUETTES DE FINITION COVER PLATES ABDECKPLATTEN 23 ...
Page 57: ...RAAMOPENER OUVRE FENÊTRE WINDOW OPENER FENSTERÖFFNER 24 3 2 1 2 1 3 OPTIE OPTION ...
Page 58: ...RAAMOPENER OUVRE FENÊTRE WINDOW OPENER FENSTERÖFFNER 25 6 7 1 2 3 4 5 8 a b 2 4 1 6 3 7 5 8 ...
Page 60: ...DBER05062019 ACD R410 ...