Page 7
Getting Started
2
4
V
A
C
+
24
V
A
C
C
O
M
M
O
N
Fa
n
S
ta
tu
s
Te
mp
+
O
ut
-
C
FM
+
O
ut
-
C
om
+
C
om
-
S
hi
e
ld
Step 6
Wiring
Wiring to BAS
Loosen the strain relief fitting nut located on the lower left side of the monitor
enclosure
(Same as used for the power wires).
Guide the cable from the BAS through the strain relief fitting and terminate on the
appropriate terminal blocks per Figure 5. Be sure to secure each screw after
landing wire in the proper location.
Secure the strain relief fitting nut.
ALARM
normally
Energized
Alarm to BAS
Fan Run Contact, NO
OA Temp to BAS
CFM to BAS
Figure 5
Wiring to BAS
Step 7
Power-Up
Activate the input power (24 VAC) to the Monitor. The IAQ-TEK Monitor Display
should be at the
HOME
menu with
ALARMS> NO.
If Monitor Display indicates
ALARMS> YES,
you probably have an installation error. Refer to the
Diagnostic Alarms Section
for an explanation of the alarms.