Set-Up Using the Wizards
The typical set-up of the IAQ-TEK is performed in three steps:
1. The Temperature Control Contractor sets up the monitor functions.
2. The Air Balancer verifies the system operation and calibrates the IAQ-TEK to
field conditions.
3. The Facilities Manager sets the alarm limits to meet their requirements for
minimum outdoor air.
The IAQ-TEK has three Set-Up Wizards which allows for the selection and
implementation of predefined step by step procedures required for set-up. The three
Wizards are;
“
Temp. Control Wizard
”, the “
Air Balancer Wizard
” and the
“
Facilities Mgmnt. Wizard
”. Steps 1 through 8 will guide you through the IAQ-TEK
Set-Up using the Wizards.
Note: The Pressure Transducer has an internal heating element, which must
be stabilized at set point before proceeding. Allow the Pressure Transducer to
warm-up for a period of 30 minutes prior to proceeding.
Step 1
:
Scroll to the
PRIMARY MENU
and select
Setup Wizards
. The
SETUP WIZARDS
menu should read as follows:
SETUP WIZARDS
> Temp. Control
!
Air Balancer
!
Facilities Mgmnt
.
!
The “!” on the right side of
the menu item indicates
this wizard has not yet
been performed.
Step 2:
To set up Monitor functions, Select
Temp. Control
from the
SETUP
WIZARDS
menu. Answer each question in the
TEMP CONTROL SETUP
.
Note: The second question will ask you for probe type, below is a diagram of
each type:
IAQ-TEK Probe
TFP5000