![Accutrol AVC5000 Installation & Operation Manual Download Page 30](http://html1.mh-extra.com/html/accutrol/avc5000/avc5000_installation-and-operation-manual_3846603030.webp)
Installation & Operation Manual - Model AVC5000
Contents of this Manual are Subject to Change Without Notification
Page 30
6.6.4.2.2.2 Horizontal Sash Calibration
Note:
After completing the Horizontal and Vertical Sash Calibration process, verify
operation by moving the sash position and
observing the “real time value”
displayed is
equal to the actual sash position.
1.
I
nitiate “Horizontal
Sash
Calibration
”
by Selecting
2. Follow the Step-by-Step
Instructions that Appear Here
3. Verify Calibration was Successful
by moving the Horizontal Panels
while observing the displayed
“Horizontal Sash % Open”.
Confirm the Displayed Value = the
Actual Value.