![background image](http://html2.mh-extra.com/html/acclaim-lighting/terra-drum/terra-drum_user-manual_5039446011.webp)
9
www.acclaimlighting.com
3 Lay the sleeve in place on a suitable
mounting surface - see page 5.
4 Attach a suitable 1.5” conduit (by
others) to the inlet hole and lock it in
place.
Repeat for the outlet hole, if required.
1.5” conduit
Conduit
lock nut
5 Run the link cable(s) through the
conduit(s) into the sleeve chamber
(using a draw wire if necessary).
6 If possible, test the connections
before the final surface is laid.
7 Prior to surfacing, replace the
supplied pour cover onto the
sleeve to prevent concrete
entering the chamber.
Tape over
the hole in the pour cover
.
8 Once the finished surface has been
applied, carefully remove the pour cover
to reveal the chamber.