| Configuring the Wallbox eMH2 –
Set-up via the Charge Point Administration application
32
WARNING!
Registration as a qualified electrician required
The working steps described below for setting up the system must be carried out in the
Installer
role.
Contact a qualified specialist electrical contractor if the following working steps need to be carried out.
1
Switch the Controller wallbox on.
y
Always wait for two minutes until the SBC has
completed set-up.
0
2
Connect an RJ45 data cable to the SBC of the Con-
troller wallbox and the computer.
y
The SBC network socket is located in the central
connections area on the inside of the wallbox.
3
Open a web browser on your computer and enter
the following address:
http://169.254.1.1:8300/
.
This opens the
Charge Point Administration
online application, where you are automatically
logged in with the
Owner
role.
y
If you are unable to connect to the application,
check your computer's network settings and, if
necessary, adjust them as follows:
Network
169.254.0.0
Subnet mask
255.255.0.0
Address
169.254.1.2
4
Click the
Change role
selection menu in the top
right and select the
Installer
role.
5
Click the
Products > Installation
tab, navigate to
the bottom of the screen and click the
Add prod-
ucts
button.
y
This opens the
Products > Catalog
tab.
NOTE
Filter functions in the product catalogue
The
Products > Catalog
tab lists all compatible Extender charging stations in the
Catalog
view.
You can enter the product number of the desired charging station directly via the
Model
search field.
You can filter all hits displayed using additional criteria such as
Revision
,
Product line
,
Type
etc.