EN - 11
PP Plus 36D/401D
4 Putting into operation
The control lead is open on the machine side. The customer has to provide the
connection of a suitable plug. If all data are provided, the machine can also
be delivered ready-to-connect. Otherwise choose a compatible plug for your
power supply and solder it to the corresponding leads according to the
connection diagram.
4.7 Setting the shielding gas
A
Yellow
H
Purple
B
White
I
White
C
Brown
K
Green
D
Purple
L
Blue
E
Yellow
M
Brown
F
Grey
N
White
G
Brown
Tab. 7
Pin assignments
NOTE
• The type and quantity of the shielding gas depends on the welding task
and the gas nozzle geometry.
• Make all shielding gas connections gas-tight.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly, before connecting
the cylinder. This will blow out any impurities that may be present.