EN - 13
Air-blast and injection unit
7 Putting into operation
6.3 Electrical connection
The electrical connection at the 2/2 directional valve is done directly at the
device socket using a suitable cable.
7 Putting into operation
During first operation, we recommend to actuate the
Air-blast and
injection unit
approx. 10-20 times until the desired quantity of anti-spatter
agent has reached the gas nozzle. The injection oiler can be actuated
manually by pressing the signal generator.
The
Air-blast and injection unit
is activated when the 2/2 directional
valve is actuated. Always start this process when the robot moves the torch neck
to the cleaning station for automatic cleaning.
The air-blast signal is set on the way to the cleaning station and is active during
the entire cleaning process.
The welding spatter released by the miller is then blown out the interior of the
gas nozzle from behind.
A second air-blast impulse after cleaning moistens the interior of the gas nozzle
with anti-spatter agent before the torch returns to the welding process.
8 Putting out of operation
1
Switch off the robot control.
NOTICE
• The operating voltage must be identical to the output voltage of the
control system.
NOTICE
• As the
Air-blast and injection unit
is integrated into a welding
system, putting out of operation depends on the robot control system.
Please make sure that the shutdown procedures for all components
mounted in the welding system are strictly observed before putting out of
operation begins.
Summary of Contents for Air-blast and injection unit
Page 4: ...DE 4 1 Identifikation Ausblas und Einsprüheinheit 1 1 EU Konformitätserklärung ...
Page 5: ...DE 5 Ausblas und Einsprüheinheit 1 Identifikation ...
Page 17: ...DE 17 Ausblas und Einsprüheinheit Notizen Notizen ...
Page 20: ...EN 4 1 Identification Air blast and injection unit 1 1 EU Declaration of Conformity ...
Page 21: ...EN 5 Air blast and injection unit 1 Identification ...
Page 33: ...EN 17 Air blast and injection unit Notes Notes ...
Page 36: ...FR 4 1 Identification Unité de soufflage et de pulvérisation 1 1 Déclaration de conformité CE ...
Page 37: ...FR 5 Unité de soufflage et de pulvérisation 1 Identification ...
Page 49: ...FR 17 Unité de soufflage et de pulvérisation Notes Notes ...
Page 53: ...ES 5 Unidad de soplado e Inyección Interna 1 Identificación ...
Page 65: ...ES 17 Unidad de soplado e Inyección Interna Notas Notas ...
Page 66: ...ES 18 Notas Unidad de soplado e Inyección Interna Notas ...
Page 67: ...ES 19 Unidad de soplado e Inyección Interna Notas Notas ...