American Beer Equipment
2001 SW 6
th
St.
Lincoln, NE 68522
20
8.
Maintenance
a.
Seamer
i.
Roller bearing grease
Your roller operation bearings come greased with between 5 to 8 grams. Grade 0 or grade 1 FDA approved
grease should be applied to the roller bearings periodically thereafter. The interval depends on usage, of
your machine. Your rollers may require grease after as little as 144 hours. However, excessive lubrication
may lead to dead heads or grease being thrown onto cans. Therefore, do not grease unless it is necessary
as this can also decrease the life of your rolls. When done properly, grease should just exit the roller.
ii.
Cylinders
1.
Make sure to keep all cylinders free of sticky beer residue and lubricated with an FDA
approved silicon grease. The shuttle cylinder, which shuttles cans into the seamer, and
the lid tap cylinder should especially be considered.
2.
Check shuttle cylinder cylinder which provides cans into seamer. Replace after 2 million
cans per seamer if needed. (4 million cans for two seamers). Change out requires
approximately 45 minutes.
3.
Check 1-3/4” bore seamer cylinders. Replace after 20 million cans per seamer if needed.
Changeout takes approximately 15 minutes.
4.
Check filler cylinder. Replace after 28 million cans if needed. Changeout takes
approximately 30 minutes.
5.
Check lower seamer cylinder. Replace after 10 million cans if needed. Changeout takes
approximately 45 minutes.
iii.
Bearings
1.
Check lower seamer bearings- Replace after 800,000 cans per seamer if needed.
Approximately 10 minutes or less to changeout.
2.
Check upper seamer bearings. Replace after 77.5 million cans per seamer if needed.
Approximately 30 minutes to changeout.
b.
Filler
1.
Make sure probes are not bent and at same height relation
2.
Probes are cleaned while CIP mode runs.
3.
Make sure Co2 tubes are not bent
c.
Other
1.
Check conveyor sprocket and teeth for wear and tear monthly.
Summary of Contents for CraftCan 15
Page 38: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 37 ...
Page 40: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 39 ...
Page 42: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 41 ...
Page 44: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 43 ...
Page 47: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 46 Figure 30 Timing Setup ...
Page 49: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 48 Figure 32 Diagnostics Screen ...
Page 50: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 49 Figure 33 Can Count ...
Page 53: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 52 Figure3 5 Setting Menu ...
Page 59: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 58 ...
Page 60: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 59 ...
Page 61: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 60 ...
Page 62: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 61 ...
Page 63: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 62 ...
Page 64: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 63 ...
Page 65: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 64 ...
Page 66: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 65 ...
Page 67: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 66 ...
Page 68: ...American Beer Equipment 2001 SW 6th St Lincoln NE 68522 67 ...