![background image](http://html1.mh-extra.com/html/abc/fleck-5810/fleck-5810_manual_3339487003.webp)
Step 2 – Plan Your Water Softener Location
Plan where to position your water softener. Here are your
primary variables to plan around.
1.
Position 9’6” from grounded electrical outlet to operate
2.
Requires water drain for disposing of water
3.
Access to home’s main water line or soft water loop
Valve to Mineral Tank
Step 3 – Begin Assembly: Fleck Valve to Mineral Tank
1.
Apply silicone lubricant to small inner
O-ring. Turn valve over and locate.
2.
Attach the top basket to the bottom of
the Fleck 5600sxt valve. Insert large end
of basket into groove and turn clockwise
into locking position.
3.
Apply a thin layer of lubricant to large
‘O’-ring located outside of threads.
4.
Connect the Fleck valve to the mineral
tank. Be sure to carefully line up the top
basket to the mineral tank’s distributor
tube.
5.
The distributor tube should fit inside
the top basket. Once aligned, fasten
the Fleck valve to the tank’s threads by
turning clockwise.
Hand tighten.
Do
this without holding the tank. It’s tight
enough once the mineral tank begins
to turn from your own force from
tightening.