OPTIS™ Integrated Next Operation and Maintenance Manual – 600173796 Rev. A
35
Cable Connection Inspection Procedure
1.
Ensure that the power connection to the system is fully seated and secured
with the strain-relief clip.
2.
If a secondary ground connection is being used, ensure that both ends of the
cable are secure.
3.
Ensure that all other connectors are fully seated and properly secured.
Infection Control
Follow the infection control procedures established in your institution for
protection of both staff and patient.
Blood on system components, panels, and cables should be removed by using a
gauze pad with soap and water and drying with a soft cloth to prevent corrosion.
The DOC cable can be cleaned with a disinfectant wipe or 1:10 Hypochlorite
solution and a soft cloth.
State: Released
Date: 2021.03.01 22:19 GMT
Effectivity: Upon Release
Summary of Contents for OPTIS 1014933
Page 2: ...State Released Date 2021 03 01 22 19 GMT Effectivity Upon Release...
Page 4: ...State Released Date 2021 03 01 22 19 GMT Effectivity Upon Release...
Page 8: ...State Released Date 2021 03 01 22 19 GMT Effectivity Upon Release...
Page 49: ...State Released Date 2021 03 01 22 19 GMT Effectivity Upon Release...