background image

10101

ABB Turbo Systems Ltd

- B -

Seite / Page  2

ABB Turbocharger VTC..4

Inbetriebnahme

Kap. / Chap. 2

Putting into operation

Inhalt

Seite

5

Inbetriebnahme

nach Stillegung

15

Contents

Page

5

Putting into operation

after out of service period

15

Summary of Contents for VTC 4 Series

Page 1: ...bo Systems Ltd CH 5401 Baden Type VTC214 13 HT844615 nMmax 620 t Mmax 700 nBmax 0 t Bmax 0 1 s C 00300 100 100 Year 2019 made in Switzerland Application according to the Operation Manual kg HZTL2202 E...

Page 2: ...eplacement intervals of components depends on the load profile turbine inlet temperature suction air temperature and turbocharger speed In case the operation conditions differs significantly from what...

Page 3: ...serbetriebnehmen HZTL 10105 Anhang HZTL 10106 Service Stellen Verzeichnis Betriebshandbuch Kurzfassung Preliminary remarks 0 Instructions on safety and hazards 1 Putting into operation 2 Operation and...

Page 4: ......

Page 5: ...0 Preliminary remarks Vorbemerkungen...

Page 6: ......

Page 7: ...e Massnahmen 7 5 Originalteile und Sicherheit 7 6 Bef higung des Personals 8 7 Kundendienst 8 8 Ausf hrungsvarianten 8 9 Lagern neuer Turbolader 9 10 Abk rzungen 9 11 Leistungsschild Turbolader 10 Con...

Page 8: ...10100 ABB Turbo Systems Ltd G Seite Page 2 Turbocharger VTC 4 Vorbemerkungen Kap Chap 0 Preliminary remarks...

Page 9: ...vor und in den entsprechenden Kapiteln Fragen Sie in Zweifelsf llen den f r Ihren Bereich zust ndigen Beauftragten f r Sicherheit und Unfall schutz 1 Foreword This operation manual will help you to b...

Page 10: ...10100 ABB Turbo Systems Ltd G Seite Page 4 Turbocharger VTC 4 Vorbemerkungen Kap Chap 0 Preliminary remarks Fig 0 1 Schnittdarstellung Turbolader Section of the Turbocharger...

Page 11: ...er an der tiefsten Stelle des Lagergeh uses 42000 Durch den Kanal X wird Sperrluft vom Verdichter zur turbinenseitigen Wellendichtung geleitet 2 Mode of operation The turbocharger consists of two mach...

Page 12: ...der ist f r den Dieselmotor einschliesslich Drehzahl und Leistung spezifiziert Wird er anderwei tig verwendet lehnt ABB Turbo Systems alle Garan tieanspr che ab 3 Correct application This turbocharger...

Page 13: ...Sicherheit des Turboladers nachteilig beeinflusst werden F r Sch den die durch das Verwenden von Nicht Originalteilen und entspre chendem Zubeh r entste hen schliesst ABB Turbo Systems jede Haftung a...

Page 14: ...sind g ltig f r unterschiedli che Ausf hrungsvarianten von Turboladern Deshalb kann es vorkommen dass im Ver zeichnis der Teilenummern auch Teile aufgelistet sind die beim gelieferten Turbolader nicht...

Page 15: ...Tabelle Temp Temperatur TL Turbolader TS Turbinenseite U Umdrehungen d M ber dem Meer VS Verdichterseite zB zum Beispiel Arbeitsschritte Aufz hlungen zus Arbeitsschritte bei Optionen Hinweise f r den...

Page 16: ...7 Feld f r die Sonderausf hrungs Bezeichnung 8 Gewicht des Turboladers in kg 9 Turbolader Typ 10 Serien Nummer 11 Baujahr des Turboladers Operational limits 1 n Mmax t Mmax Turbocharger operational li...

Page 17: ...compon ents specified must be observed without fail Turbocharger components whose permis sible operating times have expi red may not be used again under any circumstances Hinweis F r die auf dem Leist...

Page 18: ......

Page 19: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise...

Page 20: ......

Page 21: ...l chen und Substanzen 9 5 5 Gef hrdung durch Betriebs und Hilfsstoffe 10 5 6 Gef hrdung durch den Umgang mit Isolationsmaterialien 11 5 7 Gef hrdung durch elektrische Komponenten 12 6 Heben von Lasten...

Page 22: ...en Maschinen oder Sachsch den f hren wenn Ar beits und Bedienungsanweisungen mit diesem Symbol und dem Wort Vorsicht nicht oder ungenau befolgt werden Vorsichtshinweise m ssen immer eingehalten werden...

Page 23: ...m ssen immer ein gehalten werden 3 Warnschilder am Turbolader Teilenummer Part no Gr sse Size Typ 72080 175 x 22 RR131 81080 74 x 52 VTR184 VTR254 RR153 RR151 181 221 VTC 4 105 x 74 VTR304 VTR714 War...

Page 24: ...ten Der jeweiligen Arbeit angemessene Schutzausr s tung tragen wie Helm Geh rschutz Schutzbrille Schutzhandschuhe Sicherheitsschuhe Schutzkleidung Haarnetz bei langen Haaren Atemschutzmaske Turbocharg...

Page 25: ...s Benutzen sichern Beim Einschalten von Hilfsenergien Hydraulik Pneumatik Elektrizit t Wasser ist auf m gliche Gef hrdungen in Folge von Zuf hrung dieser Energien zu achten Only work with suitable too...

Page 26: ...tor gegen Drehen sichern Der Rotor kann allein durch Kaminzug drehen Turbolader vor dem Konservieren reinigen Angemessene Schutzkleidung tragen 4 4 Safety during cleaning It is possible that detergent...

Page 27: ...allverh tung beachten Arbeitsplatzsicherheit gew hrlesten Nur Arbeiten ausf hren die in die sem Handbuch beschrieben sind Nur Arbeiten ausf hren f r die eine Ausbildung durchgef hrt wurde 5 Hazards du...

Page 28: ...onen Quellenangabe Unfall verh tungsvorschriften f r Unternehmen der Seefahrt UVV See 240 y 180 120 60 30 15 0 5 85 88 91 94 97 120 x 100 105 5 3 Hazards due to noise The development of noise during o...

Page 29: ...den Schutz gegen Ber hrung von heissen Oberfl chen Die Angaben und Vorschriften des Motorenbauers zum Schutz vor hei ssen Oberfl chen der Turbolader sind zwingend einzuhalten 5 4 Hazards due to hot su...

Page 30: ...in die Atmosph re oder Verschmut zung von B den und Gew ssern durch unsachgem sses Entsorgen kann zu Sch digungen der Umwelt f hren Betriebs und Hilfsstoffe vorsichtig handhaben 5 5 Hazards due to op...

Page 31: ...tfernen Besondere Sorgfalt beim Entfernen alter D mm stoffe anwenden Isolationsmaterialien fach und umweltgerecht entsorgen nach den lokal g ltigen Vorschriften Heed the instructions for use safety da...

Page 32: ...e ab 25 kg sorgf ltig an technisch ein wandfreien Hebezeugen mit ausrei chender Tragf higkeit befestigen Auf korrektes Anh ngen der Lasten am Kranhaken achten Es darf sich niemand unter schwe benden L...

Page 33: ...raubt sein und d rfen sich w hrend des Einsat zes nicht l sen Montagevorrichtungen nur f r die beschriebenen Anwendungen verwenden Demontierte Bauteile des Turboladers standsicher deponieren max 45 In...

Page 34: ......

Page 35: ...2 Putting into operation Inbetriebnehmen...

Page 36: ......

Page 37: ...eration Contents Page 1 Lubricating oil 3 1 1 Lubricating oil classifications 3 1 2 Oil pressure 5 1 3 Oil temperature 5 1 4 Oil filter 5 2 Draining the gas outlet casing 7 3 Cooling water 9 3 1 Cooli...

Page 38: ...ystems Ltd B Seite Page 2 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation Inhalt Seite 5 Inbetriebnahme nach Stillegung 15 Contents Page 5 Putting into operation after out of s...

Page 39: ...the turbochargers are being supplied with oil from the engine s lubricationg system Note The engine manaufacturer s recommen dation regarding oil selection and oil change intervals are to be observed...

Page 40: ...tting into operation ldruck Motorschmier lkreislauf Oil pressure engine lubricating oil circuit Dosierblenden Durchmesser mm Diameter of dosing orifice plates mm VTC 214 VTC 254 VTC 304 2 5 4 bar B1 4...

Page 41: ...s dieser vor Inbetriebnahme auf Sauberkeit berpr ft werden Hinweis Beachten Sie die Vorschriften des Motoren herstellers in bezug auf Filterfeinheit und Abscheidegrad 1 2 Oil pressure The pressure gau...

Page 42: ...10101 ABB Turbo Systems Ltd B Seite Page 6 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation Fig 2 2 Gasaustrittsgeh use entw ssern Draining the gas outlet casing...

Page 43: ...ch Regen oder Kondenswasser im Gasaus trittsgeh use angesammelt hat Ist dies der Fall oder besteht diese M glichkeit so ist eine Ablaufleitung mit Absperrhahn anzubringen 2 Draining the gas outlet cas...

Page 44: ...10101 ABB Turbo Systems Ltd B Seite Page 8 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation Fig 2 3 K hlen des Gasaustrittsgeh uses Cooling the gas outlet casing...

Page 45: ...der Wasseraustrittsleitung entl ften 3 1 K hlwassertemperaturen Die Temperaturerh hung des K hlwassers ist eine an gen hertes Mass f r die durchfliessende Menge Mit Blen den in den Wasseraustrittslei...

Page 46: ...10101 ABB Turbo Systems Ltd B Seite Page 10 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation Notes Notizen...

Page 47: ...Kurzbezeichnung der Pr fzeitpunkte vorInbetr vor Inbetriebnahme nach Inbetr nach Inbetriebnahme 1 1 4 Inspection during putting into operation Inspection work includes preventive visual controls as w...

Page 48: ...rbo Systems Ltd B Seite Page 12 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation 4 nach Inbetr After vor Inbetr Before 2 3 5 7 6 8 1 Fig 2 4 bersicht Pr farbeiten Outline of ins...

Page 49: ...pr fen Abschn 4 3 Laderdrehzahl messen Kap 3 Ladedruck messen Kap 3 Temperaturen vor nach Turbine Verdichter und lzufuhr bei verschiedenen Motor leistungen messen Kap 3 WHP Interval inspection time In...

Page 50: ...n Vorsicht Vor dem Abstellen Motor ca 3 Minuten im Leerlaufweiterlaufenlassen damitdieW r me in den Lagern vom weiterzirkulierenden Schmier l abgef hrt werden kann 4 2 Inspection before putting into o...

Page 51: ...hmier lfilterein satz reinigen oder wechseln s Kap 3 5 Inbetriebnahme nach Stillegung Falls vorhanden Blindflansch zwischen Luftaustritts geh use und Ladeluftleitung entfernen Motorenseitige l und K h...

Page 52: ...10101 ABB Turbo Systems Ltd B Seite Page 16 ABB Turbocharger VTC 4 Inbetriebnahme Kap Chap 2 Putting into operation...

Page 53: ...3 Operation and maintenance Betrieb und Unterhalt...

Page 54: ......

Page 55: ...r reinigen 29 4 Unterhaltsarbeiten 32 4 1 bersicht Unterhaltsarbeiten 33 4 2 Lagerwechselzeit 36 4 3 Verdichterradwechselzeit 36 4 4 Turbinenwechselzeit 36 Contents 1 Inspection 3 1 1 Outline of inspe...

Page 56: ...Seite Page 2 ABB Turbocharger VTC 4 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D...

Page 57: ...100 h alle 100 Betriebsstunden n Ang nach Angaben des Mot herst Motorherstellers u o L schild und oder Leistungsschild 1 Inspection Inspection work during operation includes visual checks as well as...

Page 58: ...ieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D 25 50 h 100 h Inspection work Pr farbeiten Fig 3 1 bersicht Pr farbeiten Outline of inspection work n Ang Mot herst...

Page 59: ...antly from the data in the inspection report the causes must be established in accordance with chap 4 Call an authorized ABB service station see chap 8 if the reasons for the deviation cannot be esta...

Page 60: ...und Luftk hler Druckverlust des Luftk hlers K hlwassereintrittstemperatur des Luftk hlers Drehzahl des Turboladers 1 3 Inspection every 100 hours With the engine at standstill clean or replace the oi...

Page 61: ...Lagerwechsel austausch verwendete Ersatzteile nachbestellte Ersatzteile und Werk zeuge Betriebsstunden Cooling water inlet and outlet temperature of the gas outlet casing Exhaust gas temperature befor...

Page 62: ...C 4 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Axiale Ansaugung Axial air inlet Fig 3 2 Drehzahlmessung Speed measurement Schalld mpfer oder Luftsaugstutz...

Page 63: ...der Drehzahlan zeige Defekte an den Drehzahlmessger ten oder Verbin dungskabeln Fortgeschrittener Lagerschaden der den Ausfall der Drehzahlmessvorrichtung verursacht 2 Monitoring The following monitor...

Page 64: ...Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Legend for fig 3 3 1 Transducer Piezo Electric 2 Electronics rack Fig 3 3 Vibrations berwachung Vibration monitoring Legende zu Fig 3...

Page 65: ...ht zu befriedigenden Resultaten so ist ein kurzfristiger Ausbau des Rotors und ggf eine Korrektur der Rotorunwucht durch eine unserer Service Stellen zu veran lassen s Kap 8 In the event of a speed re...

Page 66: ...ursachen m ssen bestimmte Toleranzen eingehalten werden Hinweis Die Masskontrolle muss durch eine offizielle Service Stelle der ABB Turbo Systems AG durchgef hren werden 2 3 Surging of turbocharger Su...

Page 67: ...ABB Turbocharger VTC 4 Seite Page 13 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance ABB Turbo Systems Ltd 10102 D Notizen Notes...

Page 68: ...kalkungsanlagen gilt sinngem ss Gleiches Reinigungs und L sungsmittel umweltgerecht auffangen und getrennt in gesetzlich vorgeschriebenen verschliess baren Gefahrgutbeh ltern lagern und umweltgerecht...

Page 69: ...lle Reinigen Kurzbezeichnung der Pflegeintervalle 25 50 h alle 25 50 Betriebsstunden nach Bedarf nach Bedarf nach Ang nach Angabe des Mot herst Motorenherstellers 3 2 Outline of cleaning work Cleaning...

Page 70: ...C 4 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D nach Ang Mot herst see engine manuf nach Bedarf as required Fig 3 4 bersicht Pflegearbeiten Outline of clea...

Page 71: ...r Abschn 3 6 Turbine nass reinigen X reduzierte Motor leistung wenn max Gastempe ratur vor Turbine 430 C 703K reines Wasser Abschn 3 5 trocken reinigen X Motorleistung nicht reduzieren Trocken granula...

Page 72: ...Seite Page 18 ABB Turbocharger VTC 4 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Fig 3 5 Schalld mpfer VTC 254 Silencer VTC 254...

Page 73: ...nserer Service Stellen ersetzen lassen s Kap 8 Beim Montieren des Filterrahmens 81260 darauf achten dass die Verschl sse ber eine Rippe des Schalld mpferk rpers 81135 zu liegen kommen 3 3 Cleaning the...

Page 74: ...ap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Abb 3 8 Kupfergestrick einpassen Fitting copper mesh Fig 3 6 Luftfiltersegmente am Schalld mpfer Air filter segments on the silencer F...

Page 75: ...gen s Fig 3 6 Schmutz mit Putzlappen weicher B rste oder mit Pressluft entfernen Stark verschmutzte oder lose Filz f llungen durch unsere Service Stellen erset zen lassen s Kap 8 VTC 214 304 Bathe th...

Page 76: ...Seite Page 22 ABB Turbocharger VTC 4 Betrieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Fig 3 9 Sperrluftkan le Sealing air ducts...

Page 77: ...42000 are unobstructed Assemble the turbocharger after cleaning see chap 5 Reconnect the turbocharger to the engine see chap 5 Start up the engine oil and cooling water circulation system Ventilate t...

Page 78: ...Ausmass der Verschmutzung und von der Erh hung der Abgastemperatur nach der Turbine ab Die Reinigung muss wiederholt werden wenn die Gastemperatur nach der Turbine bei Vollast auf 20 K oberhalb der m...

Page 79: ...tung bei der gereinigt wer den kann durch die Gastemperatur nach Zylinder begrenzt Die vom Motorhersteller angegebenen maximal zul ssigen Temperaturen nach Zylinder d rfen nicht berschritten werden Ca...

Page 80: ...ach drei Versuchen keine Verbesserung feststellbar ist empfehlen wir den Turbolader durch eine konzessionierte ABB Servicestelle reinigen und kontrollieren zu lassen 12 Betrieb des Motors f r mindeste...

Page 81: ...ction of granulated dry cleaning medium into the turbine is best carried out at a high turbochar ger speed to ensure effective mechanical cleaning Trockenenreinigung Trockene Festk rper werden mit Dru...

Page 82: ...urbine 590 C 863 K betr gt 7 Reiberbahn Schieber ffnen 8 Druckluftabsperrventil ffnen Die vorher eingef ll te Menge Festk rper wird jetzt eingeblasen Nach 1 1 5 Minuten Druckabsperrventil schlies sen...

Page 83: ...schlossen werden s Fig 3 13 Dies um zu vermeiden dass unkontrol lierte Wassermengen in den Lader und in den Motor gelangen Dies kann zu grossen Sch den f hren Wenn kein Dosiergef ss vorhanden ist mit...

Page 84: ...Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Fig 3 10 Verdichter reinigen mit Dosiergef ss Cleaning the compressor with dosing vessel Saugstutzen Suction branch Axiales Ansaugrohr A...

Page 85: ...d cleaned by a licensed ABB service department After cleaning the compressor stage the engine should be run under load for at least another 5 minutes Reinigungsvorgang Hinweis Das Reinigen der Verdich...

Page 86: ...auschen Befestigungen sind mit einem Dreh momentschl ssel nachzuziehen s Kap 5 Ist Nachziehen nicht mehr m glich Schraubbfestigungen gegen neue aus tauschen Schmier und Hilfsmittel bereithalten 4 Main...

Page 87: ...ltsstelle in bersicht verdeckt Austauschen Kurzbezeichnung der Unterhaltsintervalle n Ang nach Angabe des Mot herst Motorherstellers u o L schild und oder Leistungsschild 4 1 Outline of maintenance wo...

Page 88: ...ieb und Unterhalt Kap Chap 3 Operation and maintenance 10102 ABB Turbo Systems Ltd D Unterhaltsarbeiten Maintenance work Fig 3 11 bersicht Unterhaltsarbeiten Outline of maintenance work n Ang Mot hers...

Page 89: ...ich im Kap 5 Note For the list of spare parts please refer to chap 5 Pos Unterhaltsstelle Unterhaltsart n Angaben des Motorherstellers u o L schild siehe Gleitlager kpl wechseln Abschn 4 2 Verdichterr...

Page 90: ...dem Leis tungsschild zu wechseln s Kap 0 Aus und Einbau der Turbine siehe Kap 5 4 2 Intervals for replacing the bea rings The operation period of the plain bearings depends on the quality of the oil f...

Page 91: ...Troubleshooting Beheben von St rungen 4...

Page 92: ......

Page 93: ...St rungen Ursachen Abhilfe 3 4 Troubleshooting Contents Page 1 Troubles causes remedies 5 Volume 6 pages Edition 07 96 ABB Turbocharger VTC 4 Seite Page 1 Beheben von St rungen Kap Chap 4 Troubleshoot...

Page 94: ...Seite Page 2 ABB Turbocharger VTC 4 Beheben von St rungen Kap Chap 4 Troubleshooting 10103 ABB Turbo Systems Ltd A...

Page 95: ...verschmutzt K hlwassermenge zu gering K hlwasseraustrittstemperatur zu hoch Entl ftung nicht ausreichend reinigen auff llen K hlsystem kontrollieren reinigen besser entl ften Turbinenleistung zu niedr...

Page 96: ...der Lager besch digt Rotor streift Turbolader verschmutzt Fremdk rper imTurbolader Lager ersetzen Service Stelle anrufen reinigen Service Stelle anrufen besch digte T eile auswechseln Kap 5 Kap 8 Kap...

Page 97: ...ter cooling water inlet temperatur too high insufficient ventilation clean top up check clean cooling system improve ventilation Turbine power too low engine performance and speed unaltered air intake...

Page 98: ...tor rubbing dirt in turbocharger foreign bodies in the tubocharger replace bearing call service station clean call service station replace damaged parts chap 5 chap 8 chap 3 chap 8 Leaks in the casing...

Page 99: ...Disassembly and assembly Demontage und Montage 5...

Page 100: ......

Page 101: ...es Lager einbauen 35 5 8 Verdichterseitiges Lager einbauen 37 5 9 Verdichterradsatz montieren 41 6 Reserveteile 46 7 Tabelle der Anziehmomente 49 Content 1 Introduction 3 2 Weights 5 3 Removing and in...

Page 102: ...Seite Page 2 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB...

Page 103: ...erschleiss Besch digte Montagevorrichtungen d r fen nicht mehr gebraucht werden und sind zu ersetzen Kundenersatzteilset Vor Beginn der Arbeiten sicherstellen dass ben tigte Kundenersatzteilsets vorha...

Page 104: ...ziehmomente f r Montagevorrichtungen von ABB Turbo Systems Falls nichts anderes beschrieben ist m ssen die Schrauben und Muttern der Montagevorrichtungen fest anliegend angezogen werden Tightening tor...

Page 105: ...Trag kraft befestigen Sich nicht unter schwe benden Lasten aufhalten s Kap 1 Turbolader 2 Weights Warning Attach individual parts and large com ponent modules carefully to suitable lifting devices whi...

Page 106: ...Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 1 Gewichte der Baugruppen Weights of assemblies 81 82 77 79 74 25 32 42 34 21...

Page 107: ...eels 4 6 10 5 32 Lager VS Bearing CE 2 3 5 34 Lager TS Bearing TE 1 1 5 2 5 42 Lagergeh use Bearing casing 53 88 5 142 51 Gaseintrittsgeh use Gas inlet casing 18 30 50 56 D senring Nozzle ring 3 5 8 5...

Page 108: ...e Page 8 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 2 Turbolader ab und anbauen Removing and installing the turbochar...

Page 109: ...Turbolader vom Motor abheben und ablassen Turbolader in sinngem ss umgekehrter Reihenfolge anbauen Inbetriebnahme gem Kap 2 3 Removing and installing the turbocharger Disconnect all oil gas air and c...

Page 110: ...ontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 3 Turbolader demontieren und montieren Disassembling and assembling the turbocharger nur VTC 4P mit...

Page 111: ...nd den Verdichterradsatz 25000 besch digt Hinweis Lage des Luftaustrittsgeh uses am La gergeh use markieren 4 Disassembling and assembling turbocharger 4 1 Removing the cartridge group If provided Dis...

Page 112: ...BB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 4 Nutzturbine demontieren und montieren Disassembling and assembling the po...

Page 113: ...the filter silen cer be consequently deformed during assem blyof the connecting brackets the clea rances may be compensated with the discs which make part of the usual supply Luftaustrittsgeh use 7400...

Page 114: ...Seite Page 14 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 5 Axial und Radialspiele Axial and radial clearances...

Page 115: ...au des Rotor blockes sind das Axialspiel A und das Radialspiel B zu messen s Fig 5 5 Vorsicht Sind die Spiele ausserhalb der Toleranz Lager demontieren ausgebaute Lager teile kontrollieren und defekte...

Page 116: ...e und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 6 Abdeckring ersetzen Replacing the cover ring VTC 254 P 304P VTC 214 304 61000 VTC 304 P 51002 51003 510...

Page 117: ...ckring 51002 vor der Monta ge mit keramischer Paste bestreichen Das Festfressen der Befestigungs schrauben wird dadurch verhindert 4 3 Replacing the cover ring Remove the cartridge group see sec 4 1 A...

Page 118: ...Seite Page 18 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 7 D senring ersetzen Replacing the nozzle ring...

Page 119: ...en zum D senring 51005 vor der Montage mit keramischer Paste be streichen Das Festfressen der Befestigungs schrauben wird dadurch verhindert 4 4 Replacing the nozzle ring Remove the cartridge group se...

Page 120: ...Seite Page 20 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Notes Notizen...

Page 121: ...sgeh use 74001 sorg f ltig ausbalancieren damit der Ver dichterradsatz 25000 bei der Montage nicht besch digt wird Zusammengebauter Turbolader am Motor anbau en siehe Abschn 3 4 5 Installing the cartr...

Page 122: ...B Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 8 Rotorblock demontieren und montieren Dissambling and assembling the cartri...

Page 123: ...pumpe 90023 so lange bet tigen bis sich der Verdichterradsatz 25000 von der Welle gel st hat Vorsicht Unter keinen Umst nden eine Verl n gerung am Pumpenhebel anbringen 5 Disassembling and assem bling...

Page 124: ...BB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 9 Rotorblock demontieren und montieren Dissambling and assembling the cartr...

Page 125: ...ht weiter zerlegen Hinweis Eventuel besch digter Verdichterrad satz zur berholung an eine autorisier te Servicestelle der ABB Turbo Systems AG senden s Kap 8 Remove the hose of the hydraulic pump and...

Page 126: ...26 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 10 Verdichterseitiges Lager ausbauen Removing the compressor end beari...

Page 127: ...nd Rund dichtung 32110 ausbauen s Fig 5 10 4 Hinweis Kontrolle und Beurteilung der Lager s Abschn 5 4 Vorsicht Ausgebaute Teile vor Verschmutzung sch tzen 5 2 Removing the compressor end bearing Remov...

Page 128: ...Page 28 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 11 Turbinenseitiges Lager ausbauen Removing the turbine end bearin...

Page 129: ...take away the end disc 34102 and the floating bush 34103 see fig 5 11 2 Note Inspection and assessement of bearing condition see sec 5 4 Caution Protect removed parts from dirt 5 3 Turbinenseitiges L...

Page 130: ...e Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Keilfl chenwinkel G Grenzwinkel Sleeve bearing liners G Critical angle Markierung x Marking x Gleitfl che Bearing surface L...

Page 131: ...rial Neues Lager einbauen Kratzspuren in den Gleitfl chen Vereinzelte leichte Kratzespuren von Fremdk rpern sind bedeutungslos Keinesfalls d rfen diese durch Nacharbeit entfernt werden Abn tzung der G...

Page 132: ...Seite Page 32 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Notizen Notes...

Page 133: ...r Verdichterrad satz zur berholung an eine autorisier te Servicestelle der ABB Turbo Systems AG senden s Kap 8 Verdichterradsatz nur als ganze Einheit ersetzen 5 5 Replacing the turbine blades Caution...

Page 134: ...ge 34 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 13 Turbinenseitiges Lager einbauen Installing the turbine end bearin...

Page 135: ...on While inserting the shaft make sure the piston ring 21004 does not rest and tilt against the sealing cover 34002 After inserting the shaft secure it with a wire if possible 5 7 Turbinenseitiges Lag...

Page 136: ...age 36 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 14 Verdichterseitiges Lager einbauen Installing the compressor end...

Page 137: ...ehendem Gewinde in die Abziehvorrichtung 90040 montieren Abpressschraube 90040 so weit eindrehen bis das Kammlager 32001 an der Wellenschulter ansteht Abziehvorrichtung 90040 und Abpresschraube 90040...

Page 138: ...38 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 15 Verdichterseitiges Lager einbauen Installing the compressor end bear...

Page 139: ...mit Zylinderschrauben 42019 und Federringen 42020 montieren Hinweis Bedingt durch die unterschiedliche Lochteilung ist nur eine Montagepositi on m glich Insert the floating bush 32103 into the plain b...

Page 140: ...age 40 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 16 Verdichterradsatz montieren Assembling the set of compressor whe...

Page 141: ...or wheels 25000 carefully clean the shaft 21001 and the wheel bush 25002 For assembling the set of compressor wheels do not use grease nor MOLYKOTE Slide the set of compressor wheels 25000 by hand ove...

Page 142: ...age 42 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 17 Verdichterradsatz montieren Assembling the set of compressor whe...

Page 143: ...ulikpumpe von der Montage Demontage Vorrichtung 90020 entfernen Kolben der Montage Demontage Vorrichtung 90020 mit 6kt Stiftschl ssel zur ckschrauben Montage Demontage Vorrichtung 90020 entfer nen Rem...

Page 144: ...age 44 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB 1 2 Fig 5 18 Verdichterradsatz montieren Assembling the set of compressor...

Page 145: ...uben Auf Kappe und Verdichterradsatz eine Markierung aufzeichnen Kappe um ein Bogen mass von 10 mm anziehen s Fig 5 18 2 Einbau des Rotorblockes gem ss Absch 4 5 Caution Measure the axial and radial c...

Page 146: ...z sind un brauchbar und deshalb auszutauschen Deshalb sind Lagerteile tropensicher in einer Blechdose zu ver packen Dose erst unmittelbar vor dem Gebrauch zu ff nen 6 Reserve parts The set of reserve...

Page 147: ...tring 32106 1 Gasket ring 32106 1 Dichtring 32110 1 Gasket ring 32110 X Reserveteile Verzeichnis X List of contents VTC 214 VTC 214 9 6 kt Schrauben 42023 51002 51005 9 Hex headed screws 42023 51002 5...

Page 148: ...ge 48 ABB Turbocharger VTC 4 Demontage und Montage Kap Chap 5 Disassembly amd assembly HZTL 10104 ABB Turbo Systems Ltd D ABB Fig 5 19 bersicht der Anziehmomente Outline of tightening torques 5 7 4 3...

Page 149: ...M 10 25 M 16 100 M 16 100 8 51011 M10 25 VTC 4P Screws with Verbus disc Schrauben Screws M4 M5 M6 M8 M10 M12 M16 M20 M22 M24 Anziehmomente Nm Tightening torque Nm 3 6 10 25 45 75 190 380 430 540 Schra...

Page 150: ......

Page 151: ...Taking out of operation Ausserbetriebnehmen 6...

Page 152: ......

Page 153: ...nate 9 6 Taking out of operation Contents Page 1 Shutting down the turbocharger 3 1 1 Fitting the blanking device 5 1 2 Installing the locking device 7 2 Mothballing the turbocharger 8 2 1 Taking out...

Page 154: ...Seite Page 2 ABB Turbocharger VTC 4 Ausserbetriebnehmen Kap Chap 6 Taking out of operation 10105 ABB Turbo Systems Ltd A...

Page 155: ...ehen Schaden mit den vorhandenen Ersatzteilen beheben oder Abschlussvorrichtung anbringen s Abschn 1 1 oder Blockiervorrichtung einbauen s Abschn 1 2 Notizen 1 Shutting down the turbocharger If in the...

Page 156: ...Seite Page 4 ABB Turbocharger VTC 4 Ausserbetriebnehmen Kap Chap 6 Taking out of operation 10105 ABB Turbo Systems Ltd A Fig 6 1 Abschlussdeckel Blanking cover 61000...

Page 157: ...estigen Vorsicht K hlwasser nur abstellen wenn das Turbinengeh use stark undicht ist und da mit den Betrieb des Motors gef hrden k nn te 1 1 Fitting the blanking device Remove the cartridge group see...

Page 158: ...Seite Page 6 ABB Turbocharger VTC 4 Ausserbetriebnehmen Kap Chap 6 Taking out of operation 10105 ABB Turbo Systems Ltd A Fig 6 2 Blockiervorrichtung einbauen Installing the locking device...

Page 159: ...en K hlwasser nur abstellen wenn das Tur binengeh use stark undicht ist und damit den Betrieb des Motors gef hrden k nnte Der Schmier lkreislauf zum Turbolader ist zu unterbrechen 1 2 Installing the l...

Page 160: ...sich jede Massnahme am Turbolader Reste von altem Motorenschmier l werden dadurch weg gesp lt und die empfindlichen Lagerpartien weitgehend vor Korrosion gesch tzt 2 Mothballing the turbocharger 2 1 T...

Page 161: ...e is no formation of con densed water possible Note Check mothballed turbochargers yearly for corrosion In the event of rust clean and renew the corrosion protection 2 2 Ausserbetriebnehmen ber 12 Mon...

Page 162: ......

Page 163: ...Appendix Anhang 7...

Page 164: ......

Page 165: ...lussdeckel 37 2 4 Blockiervorrichtung 39 7 Appendix Contents Page 1 Spare parts 3 1 1 Ordering spare parts 3 1 2 Numbering of illustrations 4 2 Directory of part numbers 7 2 1 Turbocharger 7 2 2 Tools...

Page 166: ...10106 ABB Turbo Systems Ltd C Seite Page 2 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix...

Page 167: ...spiele von Ersatzteil Bestellungen oder R ck fragen Turbolader VTC Fabrikate Nummer HT 1 Verdichterradsatz Teil Nr 25000 Bild VTC 4 02 0 Our representatives and service stations see Directory of Servi...

Page 168: ...e 2 Einordnungsnummer 3 Laufnummer Beispiel VTC _ _ 4 05 0 _ _ 1 3 Laufnummer 2 Einordnungsnummer 1 Turboladertyp und gr sse Example of spare part order or enquiry 1 set of core hole covers for the ga...

Page 169: ...ABB Turbo Systems Ltd 10106 C ABB Turbocharger VTC 4 Seite Page 5 Anhang Kap Chap 7 Appendix Notizen Notes...

Page 170: ...10106 ABB Turbo Systems Ltd C Seite Page 6 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 02 0 001...

Page 171: ...felt 21002 6kt Bundschraube 21003 Tellerfeder 21004 Kolbenring 25000 Verdichterradsatz 25003 Kolbenring 25004 Kappe resp Kappe mit Magnet f r Drehzahlmessung 2 Directory of part numbers The following...

Page 172: ...10106 ABB Turbo Systems Ltd C Seite Page 8 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 02 1 001 B 27000...

Page 173: ...ABB Turbo Systems Ltd 10106 C ABB Turbocharger VTC 4 Seite Page 9 Anhang Kap Chap 7 Appendix Teil Nr Bezeichnung 27000 Dosiergef ss Part no Designation 27000 Dosing vessel...

Page 174: ...10106 ABB Turbo Systems Ltd C Seite Page 10 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 03 0 101 A 32100 a...

Page 175: ...l mit Dichtring 34003 Dichtring 34100 Lager TS kompl 34101 Lagerk rper TS 34102 Endscheibe 34103 Schwimmb chse 34104 Zyl Schraube mit Innen 6kt Part no Designation 32002 Cover with gasket ring 32003 G...

Page 176: ...10106 ABB Turbo Systems Ltd C Seite Page 12 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 04 0 001 42000...

Page 177: ...19 Zyl Schraube mit Innen 6kt 42020 Federring 42021 Zyl Schraube mit Innen 6kt 42022 Federring 42023 6kt Schraube 42024 Sicherungsscheibe 42025 O Ring Part no Designation 42000 Bearing casing compl 42...

Page 178: ...ocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 05 0 004 A f r Geh use AA81 AA92 for casing AA81 AA92 Bild Nr Illustration No Mod VTC 304 05 0 006 Bild Nr Illustratio...

Page 179: ......

Page 180: ...10106 ABB Turbo Systems Ltd C Seite Page 16 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 06 0 102 A 61000 Option VTC254P 13 only...

Page 181: ...Fuss Part no Designation 61000 Gas outlet casing ass with core hole covers 61001 Gas outlet casing mach 61002 Segment 61003 Flange 61004 Gasket 61005 Hex headed screw 61006 Locking washer 61007 Hex he...

Page 182: ...10106 ABB Turbo Systems Ltd C Seite Page 18 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 06 1 102 A BD 03 VTC 4 13 23 VTC 4 P 13 23...

Page 183: ...ckel blind ohne Dichtung 62601 Kernlochdeckel bearb 62602 Dichtung 62603 Blindflansch 62604 6kt Schraube 62801 Dichtung 62802 Dichtung Part no Designation 62000 Set of core hole covers compl with gask...

Page 184: ...10106 ABB Turbo Systems Ltd C Seite Page 20 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 06 1 103 A BD 02 VTC 4 13 23 VTC 4 P 13 23...

Page 185: ...itt ohne Dichtung 62401 Kernlochdeckel bearb 62402 Dichtung 62403 Flansch 62404 6kt Schraube 62405 Blindflansch 62801 Dichtung 62802 Dichtung Part no Designation 62000 Set of core hole covers compl wi...

Page 186: ...10106 ABB Turbo Systems Ltd C Seite Page 22 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 254 06 1 104 BD 02 VTC 254 14 24 VTC 254P 14 16 26...

Page 187: ...hdeckel blind ohne Dichtung 62601 Kernlochdeckel bearb 62602 Dichtung 62603 Blindflansch 62604 6kt Schraube 62801 Dichtung 62802 Dichtung Part no Designation 62000 Set of core hole covers compl with g...

Page 188: ...10106 ABB Turbo Systems Ltd C Seite Page 24 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 07 0 001 74000...

Page 189: ...rscheibe 74008 Verschlussschraube 74009 Dichtung 77001 Einsatzwand bearb 79000 Diffusor kompl 79001 Diffusor bearb 79002 6kt Schraube 79003 Federring Part no Designation 74000 Air outlet casing ass 74...

Page 190: ...10106 ABB Turbo Systems Ltd C Seite Page 26 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 08 0 002 81100 81000...

Page 191: ...Mutter 81106 Federring 81107 Verschlussschraube 81108 Dichtung 81109 Verschlussschraube 81110 Dichtung 81150 D mpferscheibe kompl 81250 Luftfilterh lfte kompl Part no Designation VTC 214 304 81000 Si...

Page 192: ...10106 ABB Turbo Systems Ltd C Seite Page 28 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 254 08 0 003 81000...

Page 193: ...107 Verschlussschraube 81108 Dichtung 81109 Verschlussschraube 81135 Schalld mpferk rper 81158 Segmentschale 81159 Filzsegment 81260 Filterrahmen 81265 Filterring Part no Designation VTC 254 81000 Sil...

Page 194: ...10106 ABB Turbo Systems Ltd C Seite Page 30 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 08 5 002 82000...

Page 195: ...n kompl 82001 Luftsaugstutzen bearb 82002 6kt Schraube 82003 Federring 82004 Verschlusschraube 82005 Dichtung 82006 Verschlusschraube 82007 Dichtung Part no Designation 82000 Air suction branch compl...

Page 196: ...10106 ABB Turbo Systems Ltd C Seite Page 32 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 08 6 001 86500...

Page 197: ...o Systems Ltd 10106 C ABB Turbocharger VTC 4 Seite Page 33 Anhang Kap Chap 7 Appendix Teil Nr Bezeichnung 86500 Drehzahlmessgeber kompl falls vorhanden Part no Designation 86500 Transmitter compl if p...

Page 198: ...10106 ABB Turbo Systems Ltd C Seite Page 34 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix 90050 90070 90023 90020 90080 90040 Bild Nr Illustration No Mod VTC 214 304 09 0 900 90000 90195...

Page 199: ...che Handpumpe mit Hoch druck schlauch 90030 Festhaltevorrichtung nur auf Wunsch erh ltlich 90040 Abziehvorrichtung 90050 Transportb gel 90070 Abst tzung 90080 Hakenschl ssel X Montage Schild 2 2 Tools...

Page 200: ...10106 ABB Turbo Systems Ltd C Seite Page 36 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 09 1 001 1 2 91000...

Page 201: ...deckel 2 3 Blanking cover The drawing to the blanking cover can be ordered separately Note In case of an emergency the blanking cover can also be manufactured by yourself according to the table below...

Page 202: ...10106 ABB Turbo Systems Ltd C Seite Page 38 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix Bild Nr Illustration No Mod VTC 214 304 09 2 001 93000...

Page 203: ...ap 7 Appendix 2 4 Blockiervorrichtung Wird nur geliefert falls besonders bestellt Teil Nr Bezeichnung 93000 Blockiervorrichtung kompl 93010 Deckel 93020 Bolzen 2 4 Locking device Supplied only on spec...

Page 204: ......

Page 205: ...Verzeichnis 8 Contact information for the official service stations of ABB Turbo Systems is available online Scan the QR code to access our website ABB Turbo Systems Ltd Bruggerstrasse 71a CH 5401 Ba...

Page 206: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB...

Reviews: