Your safety first
– always!
That's why our instruction manual begins with these recommendations:
Fully comply with the legally recognized standards (ANSI / IEC), the connection conditions of the local electrical
utility and the applicable safety at work regulations.
Pay special attention to the hazard notes in the instruction manual marked with this warning symbol.
Make sure that specified data is not exceeded under operational conditions of the switchgear or switchboard.
Electrical shock and burn hazards exist whenever working in or around electrical equipment. Turn off power be-
fore performing any inspection or maintenance operations. Check line terminals to verify that the equipment is
de-energized and grounded. Check terminals to ensure back-feed conditions do not exist.
Keep the instruction manual accessible to all persons concerned with installation, operation and maintenance.
The user’s personnel are to act responsibly in all matters affecting safety at work and the correct handling of the
switchgear.
If you have any further questions on this instruction manual, the members of our
field organization will be pleased to provide the required information.
Always observe the instruction manual and follow the rules
of good engineering practice!
Hazardous voltage can cause electrical shock and burns.
Disconnect power, then earth and short-circuit before proceeding with any
work on this equipment.
In case of any uncertainty or questions related to mounting and/or operation which
are not described in the manual please contact ABB.
According to IEC 62271-1 p. 5.12, IEC 62271-102 p. 5.104.3.1, and IEEE C37.20.4-
2013 p. 7.12, position of switch disconnector has to be clearly indicated. NAL and
VersaRupter switches allow 100% certainty to determine the position of the main
contacts.
ABB recommends to verify the position of the main knives before and after each op-
eration.
ABB recommends installing switches in applications where it is possible to visually
check the position of the main knives e.g. through an inspection window.
Summary of Contents for VersaRupter
Page 74: ...VersaRupter MV Indoor Switch Installation and Operation Manual 74 Auxiliary Switch Kit ...
Page 75: ...VersaRupter MV Indoor Switch Installation and Operation Manual 75 Chain Drive Assembly ...
Page 76: ...VersaRupter MV Indoor Switch Installation and Operation Manual 76 Left Hand Shaft Extension ...
Page 77: ...VersaRupter MV Indoor Switch Installation and Operation Manual 77 Mechanical Door Interlock ...
Page 80: ...VersaRupter MV Indoor Switch Installation and Operation Manual 80 HE HM Handles ...