Installation of the equipment is carried out based on the system and the place in which
the equipment is installed; therefore, its performance depends on the correctness of the
connections.
Staff authorised to carry out the installation must be specialised and
experienced in this job; they must also have received suitable training on
equipment of this type.
The operation must be carried out by specialised staff; it is in any case
advisable to comply with what is written in this manual and adhere to the
diagrams and attached documentation.
For Safety reason only a qualified electrician, who has received training and / or has de
-
mostrated skills and knowledge in construction and in operation of this unit, can install this
inverter.
The installation is done by
qualified installers and/or licensed electrician according to the
applicable local code regulations
The connection of an inverter energy system to an electrical installation connected to the
electricity distribution network shall be approved by the appropriate electrical distributor.
The installation must be carried out with the equipment disconnected from the grid and from
the photovoltaic generator.
When the photovoltaic panels are exposed to light, these supplies a direct current voltage to
the inverter.
5
Installation