
36
ABB Power Distribution
Figure 5/12: Insulating covers for busbars
58
Insulating cover
58.1
Support for cover
58.5
Lid (for 17.5 kV only)
Figure 5/11: Installation of the busbars
28
Bushing plate
28.1 „Panel partitioning“ bag group
29
Busbar bushing
29.2 Busbar support for double conductor
58
Insulating cover
58.1 Support for cover
58.5 Lid (for 17.5 kV only)
58.6 Washer, DIN 125
58.7 Washer, 25 mm diameter
29
58
29.2
28.1
X
58.1
58.5
58.6
58.7
58.1
Detail X
28
58
84
180
104
30
15
ø
108
Cutting location for
tee-off conductor
system 2 x 100 x 10
20
23
60
32
15
58.1
45
38
ø
11
0
58.5
Cutting location for
tee-off conductor
system 2 x 100 x 10
Summary of Contents for UniGear ZS1
Page 66: ...ABB Power Distribution 67 ...