28
ABB Power Distribution
Figure 5/1: Guideline construction data for foundation frame on a
concrete floor
See figure 5/2 for sections
FT = panel width
1)
Minimum dimensions
2)
When the minimum dimension
1)
are changing the corresponding dimension
2)
must be adjusted accordingly
Figure 5/1a: Panels without toroidal-
core current transformers
10
Screed, see also figure 5/5
11
To main earthing bar
12
Opening for power cable
13
Opening for control cable
14
Door
15
Busbar metering or busbar earthing
16
Wall opening for pressure relief
17
Pressure relief duct
18
Diverter
Figure 5/1b: Panels with and without
toroidal-core current
transformers
1)
1)
1300
50
75
75
1)
800
200
450
180
75
75
80
FT = 650
FT = 1000
FT = 800
FT = 650
575
925
725
600
200
200
450
80
160
130
145
130
145
130
160
147
78,5
131,5
86
124
78,5
154,5
175
150
150
175
4
5
3
1
2
A
D
C
B
A
D
C
B
2)
1)
100
1350
1300
1450
154,5
78,5
124
86
131,5
78,5
147
160
130
145
130
145
130
160
200
180
FT = 1000
1)
80
75
FT = 800
FT = 1000
75
75
925
925
200
600
800
800
E
E
4
5
3
1
2
2)
2)
1 Operator aisle
2 Basement entrance
3 Main earthing bar
4 Instead of individual openings, continuous openings
or drilled holes are possible
5 Platform
6 Control cabinet, optional
7 Absorber
8 Opening for ventilation
9 Height of cable basement as required