30
ABB Power Distribution
4
1)
2)
1)
2)
2)
2)
15
1
175
245
1450
1350
100
80
FT = 1000
1300
FT = 1000
FT = 800
15
15
15
E
5
E
130
145
130
145
130
160
160
130
145
130
130
160
147
78.5
86
145
3
1
2
131,5
160
124
78,5
154,5
1)
3)
11
Raised false floor, site supply,
top of false floor 0 to 3 mm above top of
finished floor
12
Power cable
13
To main earthing bar
14
Door
15
Busbar metering or busbar earthing
16
Wall opening for pressure relief
17
Pressure relief duct
18
Diverter
150
150
175
160
130
145
130
145
130
160
78.5
131,5
86
124
154,5
147
A
D
C
B
4
5
A
D
C
B
1300
1)
50
1)
1)
80
FT = 650
FT = 1000
FT = 800
80
2)
1)
15
1
175
145
2)
15
2)
15
2)
15
3
1
2
FT = 650
78,5
175
Figure 5/3: Guideline construction data for a raised
false floor
See figure 5/4 for sections
FT = panel width
1)
Minimum dimension
2)
Maximum dimension
3)
When the minimum dimensions
1)
are changing the corresponding dimensions
3)
must be adjusted accordingly
Figure 5/3b: Panels with and without
toroidal-core current
transformers
Figure 5/3a: Panels without toroidal-
core current transformers
1
Operating aisle
2
Basement entrance
3
Main earthing bar
4
Raised false floor structure, only shown in the
vicinity of the switchgear
5
Platform
6
Control cabinet, optional
7
Absorber
8
Opening for ventilation
9
Height of cable basement as required
10
Covering, site supply
Summary of Contents for UniGear ZS1