background image

Tel: (888) 552-6467  

             Fax: (800) 316-4515

              www.tnb.com

06/18  750.1781_Rev. H

8/12

300/600W Mini Inverter

  

SYSTEM OPERATION

• The diagnostic/charger is a self-contained, fully automatic microcontroller-based system.
• Once the installation is complete, it is not necessary to have the AC power energized. Only the battery needs to be connected.
   The unit goes directly into lockout mode and waits for AC power to be restored.

1. ALARM SILENCE / MANUAL TEST / SYSTEM INITIALIZATION

• Alarms are silenced by pushing the “TEST” switch less than one half second. Alarm indication can only be silenced after correcting the
  fault or by re-initializing the system.
• Manual forced tests are initiated by pushing and holding the “TEST” switch more than one second. The 1-minute test will start.
• System initialization is done by holding the “TEST” switch for at least 6 seconds.

2. DIAGNOSTIC AND NEXUS

®

 (OPTION)    

I

f the audible alarm has been activated, any fault condition will produce an audible warning that 

consists of an intermittent beep: one second on, one second off. 
Refer to figure 3 for two lists of possible conditions.

a.   BATTERY DISCONNECT / INVERTER FAILURE

 

The status indicator displays a steady red LED if the battery circuit is open or

 shorted, or if there is an Inverter failure.

b. BATTERY FAILURE

The status indicator displays 1 red blink and a pause of 5 seconds if an incorrect battery 
is installed (e.g. 12V battery on a 6V system), or if the battery has failed a timed or forced 
test (reached LVD level before the end of the test).

c. CHARGER MONITORING

The status indicator displays 2 red blinks and a pause of 4 seconds if the charging 
current does not fall within limits corresponding to the charger command state.

d. LIGHTING LOAD CAPTURE SEQUENCE

The capture sequence is initiated only by a reset of the system. This is done by holding the “TEST” switch for at least 6 seconds. The 
reset also initializes the main counter. This renewal takes place to compensate for system variations when the unit ages. Renewal is not 
allowed if there is a lighting load failure alarm.

e. SERVER FAILURE

The Nexus server (controller or PC) is no longer communicating with the RF unit’s modem. To solve this issue, you need to verify if the 
Nexus server is up and running. If it is up and running, check to see if other surrounding emergency lighting units are not powered. If they 
are powered off, they will prevent the unit in question to communicate with the modem. Otherwise simply reset the modem.

f. BLINK MODE

A “Blink mode” signal was sent from the Nexus server (controller or PC) to the emergency lighting unit. To stop the “Blink mode”, you 
need to access the Nexus server and execute a stop blink mode operation.

g. NOT COMMISSIONED

The unit was not commissioned and therefore not registered in the Nexus server. Once the unit is commissioned, the auto-test will be 
disabled and the LED will show a steady green for 10 seconds and steady orange for 1 second.

To cancel a fault condition, after applying all corrective actions, simply reset the unit.
*Refer to Nexus

®

 installation addendum for more details.

   

3. AUTOMATIC UNIT TEST (30-DAY TEST)

Every 30 days, while in charging mode, the sequence generator will generate a command to energize the transfer on the emergency 
lighting circuit for a variable test period depending on the yearly sequence.  

  

  

• If the battery fails to complete the discharge test, the charger will display a battery failure and the test will abort.
• The 30-day automatic test sequence is reset every time the lighting load is turned on, including the manual test.

FEATURES AND OPTIONS

IMPORTANT:

Reset the system whenever you add or change the lighting load. To reset the system, press the 
test switch for 6 seconds.

300W(MIN)

600W(MIN)

Monthly test

1

1

6 month test

10

10

12 month test

30

30

Figure 3

Summary of Contents for Thomas & Betts 300W

Page 1: ...rical Code and local regulations 12 The Mini Inverter contains potentially hazardous voltages Installation maintenance and service work should be performed by qualified and trained personnel 13 Electricians and end users need to ensure product system compatibility before final installation 14 Units to be installed only as per configuration described in this instruction manual IMPORTANT Do not exce...

Page 2: ...BATTERY CAUTION BEFORE INSTALLING MAKE CERTAIN THE A C POWER IS OFF NOTE THE BATTERY S ARE SHIPPED SEPARATELY PLACE THEM IN A LOCATION AWAY FROM THE WORK AREA TO AVOID DAMAGE UNTIL THEY ARE TO BE INSTALLED CAUTION ONLY ONE VOLTAGE IS ALLOWED 120V OR 277V OR 347V CONNECTION TO MORE THAN ONE VOLTAGE MAY RESULT IN EQUIPMENT FAILURE AND VOID THE WARRANTY CAUTION FOR NORMALLY ON UN SWITCHED UNITS THE J...

Page 3: ...ppropriate position of the LOAD terminal block 120V OR 277V OR 347V Connect the fixture Neutral to the Neutral position of the LOAD terminal block Refer to Figure 2B c UN SWITCHED NORMALLY ON FIXTURES Connect the AC Line input wire of the fixtures to the appropriate position of the LOAD terminal block 120V OR 277V OR 347V Connect the fixture Neutral to the Neutral position of the LOAD terminal blo...

Page 4: ...itch is pressed for 1 second and then released The Status Indicator will start flashing green The designated fixtures will either illuminate if they were off or will stay on if they were normally illuminated Test duration is fixed at 1 minute At the end of the 1 minute test the unit will revert to recharge mode The status indicator will be steady ON green if no fault has been detected If a fault i...

Page 5: ...30 C 68 to 86 F their life expectancy is 8 to 10 years The equipment must be tested for a minimum of 30 minutes once per year When the batteries will no longer operate the load for 30 minutes for they must be replaced Replace only with manufacturer supplied parts Properly dispose of or recycle the Lead Acid battery NOTE THE FOLLOWING WIRING DIAGRAMS HAVE BEEN SIMPLIFIED FOR CLARITY FIGURE 1A 300W ...

Page 6: ...20Vac Neutral see note 3 347Vac Primary Un Switched AC Input Normally ON Lighting Load Neutral see note 3 Ground Ground 347Vac Neutral see note 3 120Vac Neutral see note 3 Ground Neutral Line Switched Line Un Switched Line Neutral FIGURE 2B WIRING DIAGRAM NORMALLY OFF LOAD Lighting Load Fluorescent LED Incandescent Notes 1 Connect fixture supply and unit ground in accordance with local and nationa...

Page 7: ...tched Line Neutral see note 4 Un Switched see note 3 120Vac Neutral 120V Neutral Primary Un Switched AC Input Normally ON Lighting Load see note 4 see note 4 Ground Ground Lighting Load Fluorescent LED Incandescent 347Vac Neutral 347V Neutral Primary Un Switched AC Input Normally ON Lighting Load see note 4 see note 4 120Vac Neutral 120V Neutral 120Vac Ground 0 10V FIGURE 2D WIRING DIAGRAM UN SWIT...

Page 8: ...system This is done by holding the TEST switch for at least 6 seconds The reset also initializes the main counter This renewal takes place to compensate for system variations when the unit ages Renewal is not allowed if there is a lighting load failure alarm e SERVER FAILURE The Nexus server controller or PC is no longer communicating with the RF unit s modem To solve this issue you need to verify...

Page 9: ...mming control The dimming function must be disabled during a power failure in order for the load to provide a 100 level of lighting The circuit consists of a single pole dry contact relay that is normally closed in stand by operation In emergency mode power failure the relay contacts open and disconnect the dimming signal from the lighting load allowing the load to operate at 100 light level INSTA...

Page 10: ...ed to the Nexus system Lamp load is OFF None if unit is in normally off mode Nexus option Unit is operating correctly Unit is not commissioned to the Nexus system LED flashing GREEN OFF Lamp load is ON None the unit is in test mode or is sampling load Unit is operating correctly Lamp load is OFF Inverter switched OFF Check the inverter ON OFF switch Turn it on Switch is located on the right side o...

Page 11: ...eries LED Flashing RED 2 times every 6 seconds Charger Failure Error Charger not working Reset the unit see page 4 and if the same error is displayed replace the charger board LED Flashing RED 3 times every 6 seconds Lamp Failure Error Lost 10 or more if initial lamp loading is lost Replace the bad lamp and reset the unit LED AMBER ORANGE steady On Network server down The Nexus modem is no longer ...

Page 12: ...ERVICE FOR REPLACEMENT PARTS SERVICING MUST BE PERFORMED BY QUALIFIED PERSONNEL Consult Customer Service for current warranty information All information and specifications contained in these instructions are subject to change due to engineer design errors and omissions 2014 Thomas Betts Limited All rights reserved ...

Page 13: ...L ENTRETIEN DOIT ÊTRE EFFECTUÉ PAR UN PERSONNEL QUALIFIÉ Pour obtenir l information en vigueur sur la garantie veuillez vous adresser au service à la clientèle Toute l information et toutes les spécifications contenues dans ces instructions sont modifiables à cause de changements à la conception des erreurs et des omissions 2014 Thomas Betts Limitée Tous droits réservés ...

Page 14: ...te 2 fois toutes les 6 secondes Erreur de défaillance du chargeur Erreur de défaillance du chargeur Réinitialiser l unité voir page 4 si la même erreur s affiche remplacer la carte du chargeur DEL ROUGE clignotant 3 fois toutes les 6 secondes Erreur de défaillance de lampe Perte de 10 ou plus si le chargement initial de lampe est perdu Remplacer la lampe défaillante et réinitialiser l unité DEL AM...

Page 15: ...ne si l unité est en mode normalement inactif Option Nexus L unité fonctionne correctement L unité n est pas mise en service auprès du système Nexus DEL clignotante VERTE ÉTEINTE La charge de lampe est ACTIVE Aucune si l unité est en mode de test ou prend un échantillon de charges L unité fonctionne correctement La charge de lampe est INACTIVE Interrupteur d onduleur ÉTEINT Vérifier l interrupteur...

Page 16: ...tème de contrôle d éclairage à basse tension par gradation Cette fonction doit être désactivée durant une panne de courant afin que la charge puisse fournir un niveau d intensité lumineuse de 100 Le circuit consiste d un relais unipolaire à contacts secs normalement fermés en mode de fonctionnement de veille En mode de secours panne de courant les contacts s ouvrent et coupent le signal de gradati...

Page 17: ... ÉCLAIRAGE Le déclenchement de la séquence de capture exige la réinitialisation du système Pour réinitialiser appuyer sur l interrupteur d essai pendant au moins 6 secondes Ceci initialise également le compteur principal Suivant 12 périodes de 30 jours les données de capture de la charge d éclairage sont renouvelées Ceci est réalisé afin de compenser pour les variations du système avec le temps Le...

Page 18: ...eutre Neutre Entrée ac primaire Normalement Charge d éclairage éteinte la terre 347Vca voir note 4 Mise á 347V voir note 4 Neutre Neutre Entrée ac primaire Normalement Charge d éclairage éteinte la terre 120Vca Commutée Neutre Non commutée Ligne Neutre Charge d éclairage Au fluorescent DEL à incandescence Mise á la terre Non commutée Cábles Sortie Cábles Entrée 0 10V FIGURE 2D SCHÉMA DE CÂBLAGE CH...

Page 19: ...te Interrupteur Mural Interrupteur Mural Neutre Charge d éclairage Au fluorescent DEL à incandescence la terre Mise á la terre Mise á la terre Mise á la terre Cábles Sortie Cábles Entrée Commutée FIGURE 2B SCHÉMA DE CÂBLAGE CHARGE NORMALEMENT ÉTEINTE IMPORTANT POUR UN ÉCLAIRAGE NORMALEMENT ÉTEINT ENLEVER CE CAVALIER 120Vca voir note 3 voir note 3 120Vca voir note 3 347Vca voir note 3 Mise á 347V v...

Page 20: ...e prévue est de 8 à 10 ans Équipement doit être testé une fois par année pendant au moins 30 minutes Lorsque les piles ne font plus fonctionner la charge pendant 30 minutes pour les unités il faut les remplacer Les pièces de rechange utilisées doivent être fournies exclusivement par le fabricant Veuillez éliminer ou recycler adéquatement les batteries au plomb acide NOTE LE SCHÉMA DE CÂBLAGE CI DE...

Page 21: ...suite qu on le relâche L indicateur d état commencera à clignoter en vert Les appareils désignés s allumeront s ils étaient éteints ou resteront allumés s ils étaient allumés en mode normal La durée des essais est réglée à 1 minute À la fin de l essai d une minute l unité rétablira le mode de recharge L indicateur d état sera alors allumé en continu en vert si aucun défaut n a été détecté Si une d...

Page 22: ...reil au Neutre sur le bloc de jonction SORTIE LOAD Se référerréférer à la Figure 2B c APPAREILS NORMALEMENT ALLUMÉS Connecter le fil d entrée LIGNE c a des appareils à la position appropriée sur le bloc de jonction SORTIE LOAD Connecter le fil Neutre de l appareil au Neutre sur le bloc de jonction SORTIE LOAD Se référer à la Figure 2C d COMMUTATION NORMALEMENT ALLUMÉ LOAD peuvent être allumés et é...

Page 23: ...T COUPÉ NOTE LES BATTERIES SONT EXPÉDIÉES SÉPARÉMENT LES ENTREPOSER À L ÉCART DU LIEU DE TRAVAIL JUSQU AU MOMENT DE L INSTALLATION MISE EN GARDE UNE SEULE TENSION EST PERMISE 120V ou 277V ou 347V TOUTE CONNEXION À UNE TENSION AUTRE QUE CELLE SPÉCIFIÉE ENTRAÎNERA UNE DÉFAILLANCE DE L ÉQUIPEMENT ET ANNULER A LA GARANTIE MISE EN GARDE POUR LES LAMPES NORMALEMENT ALLUMÉES SUR UNE SORTIE DE 277VAC LE C...

Page 24: ...el à un médecin 11 Installer conformément aux règlements du NEC et de tous les codes locaux applicables 12 Le Mini onduleur contient des tensions potentiellement dangereuses Tout travail d installation d entretien et de réparation doit être effectué par un personnel qualifié ayant suivi une formation adéquate 13 Les électriciens et les utilisateurs finals doivent confirmer la compatibilité du syst...

Reviews: