Prepare a standard prefabricated foundation................................................. 44
Replace the standard base with an alternative base....................................................... 45
5.4.1
Mechanical installation...........................................................................................................47
5.5.1
Open the cable inlet and remove the cable gland............................................48
Guide the cables through the opening in the cable guide plate................... 48
Electrical installation.............................................................................................................. 49
5.6.1
Tilt sensors installation (option)..........................................................................................52
5.7.1
Cable management system installation (option)............................................................. 55
5.8.1
Prepare the cable management system.............................................................55
Install the cable management system................................................................56
6
Operation........................................................................................... 58
Charge session.........................................................................................................................59
6.4.1
De-energize the EVSE............................................................................................................. 60
6.6.1
De-energize the EVSE - general procedure........................................................60
Contents
9AKK108466A3703-EN | 001
5