5
Installation
5.1
General installation procedure
Preliminary requirements
•
All required permits to
obey the local rules are
granted.
•
The AC input cable is
available.
•
Tools for installation. Refer
to section
.
•
Installation engineer
•
There is no voltage on
the AC input cable during
the complete installation
procedure.
Procedure
1. Prepare for installation. Do these steps:
a. Prepare the site. Refer to section
b. Unpack the EVSE. Refer to section
.
c. Move the cabinet to the correct location. Refer to section
2. If a lower installation of the EVSE is required, for wheelchair accessibility,
remove the base. Refer to section
3. Do the mechanical installation. Refer to section
.
4. Do the electrical installation. Refer to section
5. If it is necessary, install these optional elements:
•
Tilt sensors. Refer to section
•
Cable management system. Refer to section
.
6. Prepare for commissioning. Refer to section
.
5.2
Site preparation
5.2.1
Prepare the site
Preliminary requirements
•
Installation engineer
Installation
42
9AKK108466A3703-EN | 001