5.3
Prepare the foundation
5.3.1
Prepare the foundation - general procedure
Preliminary requirements
•
Installation engineer
Procedure
1. Select the correct foundation, based on the surface you install the cabinet on.
2. Embed the cables in the ground with or without a cable duct. Refer to the local
rules.
3. Prepare the foundation.
•
For a casted foundation, refer to section
.
•
For a standard prefabricated foundation, refer to section
.
4. If it is necessary, replace the base with an alternative base. Refer to section
.
5.3.2
Prepare a casted foundation
Preliminary requirements
•
The cover of the removed.
•
Concrete drill
•
Wire cutter
•
Installation engineer
•
Concrete
Procedure
1. Dig the hole (A) for the casted
foundation. For the specifications,
refer to section
2. Pour the concrete into the hole. Make
sure that the cable duct/conduit(B) is
in the correct position.
3. Let the concrete dry.
4. Pull the AC wires though the duct/
conduit. Apply the full cable slack.
5. Drill the fixing points (C).
6. Install the dowels (D).
7. Cut the wires to the correct lenght.
5.3.3
Prepare a standard prefabricated foundation
Preliminary requirements
•
Installation engineer
•
Prefabricated foundation.
Refer to section
.
A
C
D
B
Installation
44